Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

797 Queen St E

The City of Toronto has 8 building permits since 2017 (8 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will be constructed as an elevated guideway on an embankment adjacent to the existing GO corridor. The site is bounded by Queen, Degrassi and Strange Streets as well as the GO embankment. The station will be accessible from Queen Street, Degrassi Street and Strange Street. There is an existing Overhead Catenary System (OCS) infrastructure in place as part of the local Street Cars transportation network and the OCS is located b…

    Applied Jun 23, 2026 · Permit 25 120152 FSU

    Application on hold
  • Alternative solution

    Proposal for alternative solution approach to code compliance for stations related to the application of emergency power.

    Applied Mar 27, 2026 · Permit 26 135661 ALT

    Under review
  • Alternative solution

    It is proposed to provide an alternative solution approach to code compliance for stations related to the application of spatial separation for exterior walls of the station of prescriptions of OBC Subsection 3.2.3.

    Applied Nov 14, 2025 · Permit 25 254194 ALT

    Deficiency notice issued
  • Plumbing

    Plumbing - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on an embankment adjacent to the existing GO corridor. The site is bounded by Queen, Degrassi andStrange Streets as well as the GO embankment. The station will be accessible from Queen Street, Degrassi Street and Strange Street. There isan existing Overhead Catenary System (OCS) infrastructure in place as part of the local Street Cars transportation network and the OCS islocated beneath the existing GO…

    Applied Feb 21, 2025 · Permit 25 120152 PLB

    Issuance pending
  • Drains and site services

    Drain - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on an embankment adjacent to the existing GO corridor. The site is bounded by Queen, Degrassi andStrange Streets as well as the GO embankment. The station will be accessible from Queen Street, Degrassi Street and Strange Street. There isan existing Overhead Catenary System (OCS) infrastructure in place as part of the local Street Cars transportation network and the OCS islocated beneath the existing GO cor…

    Applied Feb 21, 2025 · Permit 25 120152 DRN

    Issuance pending
  • New building

    The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will be constructed as an elevated guideway on an embankment adjacent to the existing GO corridor. The site is bounded by Queen, Degrassi and Strange Streets as well as the GO embankment. The station will be accessible from Queen Street, Degrassi Street and Strange Street. There is an existing Overhead Catenary System (OCS) infrastructure in place as part of the local Street Cars transportation network and the OCS is located beneath the existing GO corrido…

    Applied Feb 21, 2025 · Permit 25 120152 BLD

    Under review
  • Drains and site services · Site service

    Drain - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on an embankment adjacent to the existing GO corridor. The site is bounded by Queen, Degrassi andStrange Streets as well as the GO embankment. The station will be accessible from Queen Street, Degrassi Street and Strange Street. There isan existing Overhead Catenary System (OCS) infrastructure in place as part of the local Street Cars transportation network and the OCS islocated beneath the existing GO cor…

    Applied Feb 21, 2025 · Permit 25 120152 STS

    Examiner's notice sent
  • Heating and ventilation

    HVAC - The proposed Leslieville Station is divided into two buildings referred to as the North Building and South Building. The station buildings will beconstructed as an elevated guideway on an embankment adjacent to the existing GO corridor. The site is bounded by Queen, Degrassi andStrange Streets as well as the GO embankment. The station will be accessible from Queen Street, Degrassi Street and Strange Street. There isan existing Overhead Catenary System (OCS) infrastructure in place as part of the local Street Cars transportation network and the OCS islocated beneath the existing GO corr…

    Applied Feb 21, 2025 · Permit 25 120152 HVA

    Issuance pending

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 64 Saulter St · Minor variance

    To alter the existing two-storey row house dwelling by constructing a complete third storey addition (attic space which will be used as habitable space).

    160 m away · filed Nov 13, 2025 · Approved

  • 18 Mc Gee St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front porch canopy, a front second storey addition, and a complete third storey addition.

    230 m away · filed Oct 2, 2025 · Approved

  • 14 Mc Gee St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a complete third storey addition.

    240 m away · filed Jul 10, 2025 · Approved

  • 786-788 Queen St E · Minor variance

    To construct a new six-storey mixed-use building (with stepping down of heights towards the rear lot line), containing 15 residential dwelling units, and one commercial unit (to be located on the ground level).

    80 m away · filed Dec 19, 2024 · Approved

  • 44 Saulter St · Minor variance

    To alter the existing two-storey townhouse dwelling (with two residential dwelling units) by constructing a new rear second storey deck with stairs.

    190 m away · filed Feb 12, 2024 · Approved

  • 16 Mc Gee St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a partial rear two-storey addition, a partial rear third storey addition with a rear deck, and a new front porch with stairs and an accessibility lift.

    230 m away · filed Aug 1, 2023 · Approved

  • 25 Grant St · Minor variance

    To construct a new two-storey detached rear ancillary building (containing one laneway suite), with a partially cantilevered (west) second storey, a covered (west) porch with stairs, and a side (north) second storey balcony. Also, to construct one rear parking space abutting the public lane. There will be a total of two residential dwelling units on this lot (one unit occupying the existing two-and-one-half-storey townhouse main dwelling and one unit occupying the ancillary building).

    200 m away · filed Feb 24, 2023 · Approved

  • 12 Boulton Ave · Minor variance

    To alter the existing two-storey dwelling by constructing a rear two-storey addition with a first storey deck.

    100 m away · filed Feb 24, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.