Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

798 Pape Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    bwv installation

    Applied Jun 16, 2022 · issued Jun 20, 2022 · completed Jun 28, 2022 · Permit 22 163353 DRN

    Closed
  • Drains and site services · Back water valve (Sewer only)

    Proposed new main line full port Back Water Valve (Sewer only)

    Applied Jul 13, 2020 · completed Sep 8, 2020 · Permit 20 166685 DRN

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 654-668 Danforth Avenue

    49 storeys · 496 homes · Mixed use

    340 m away · Site plan · Under review · filed Aug 3, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 108 Eaton Ave · Minor variance

    Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.

    150 m away · filed Jun 2, 2026 · Accepted

  • 49 Muriel Ave · Minor variance

    To construct a new front yard parking pad, abutting Muriel Avenue.

    110 m away · filed Oct 10, 2025 · Refused

  • 111 Gough Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement below), a third storey addition, a side (south) basement walkout, a rear ground floor covered deck with stairs, and front and rear third storey balconies There will be a total of two dwelling units on the lot (one secondary suite in the basement).

    180 m away · filed Jul 25, 2025 · Deferred

  • 13 Cruikshank Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing an east side three-storey addition, a front covered porch, and a rear deck with stairs. Also, to permit a front yard parking pad and to construct a rear one-storey ancillary building (shed). The existing rear one-storey ancillary building (three-car garage) will be demolished.

    180 m away · filed Mar 10, 2025 · Approved

  • 234 Browning Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (solarium). Also, to construct a one-storey ancillary building (detached garage), in the front yard.

    180 m away · filed Jul 24, 2024 · Approved

  • 878 Carlaw Ave · Consent

    Section 57(1) of the Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.

    210 m away · filed Jun 12, 2024 · Approved

  • 114 Eaton Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a side (south) two-storey addition, an integral garage, a front porch with stairs, a rear ground floor deck with stairs, a front second storey balcony, and a rear basement walkout. Also, to construct interior alterations to convert the dwelling into a duplex. There will be two residential dwelling units within this altered dwelling.

    160 m away · filed May 17, 2024 · Approved

  • 889 Carlaw Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear balcony.

    160 m away · filed Dec 13, 2023 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.