Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

8 Avion Ave

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Other

    Proposal to construct a new 2nd level balcony at the North side of this converted house - 4 units. See also 12 187445 ZZC.

    Applied May 28, 2013 · issued Aug 27, 2013 · Permit 13 176164 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Selwood Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage), in the rear yard.

    200 m away · filed Sep 1, 2026 · Postponed

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    130 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Consent

    To obtain consent to sever the property into two residential lots.

    130 m away · filed Feb 3, 2026 · Postponed

  • 52 Balsam Ave · Minor variance

    To maintain the existing two-storey semi-detached dwelling (duplex). There is a total of two residential dwelling units on this lot.

    130 m away · filed Feb 3, 2026 · Postponed

  • 34 Balsam Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.

    160 m away · filed Aug 25, 2025 · Approved

  • 29 Maclean Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front third storey addition (for habitable space).

    220 m away · filed Jul 30, 2025 · Approved

  • 34 Fernwood Park Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing an integral garage, a partial third storey addition, a rear basement walkout, and a rear first level deck. The front porch will be reconstructed with a canopy and stairs. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).

    240 m away · filed Jul 28, 2025 · Approved

  • 32 Fernwood Park Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition, a rear first level deck, and rear and side (south) basement walkouts. The front porch will be reconstructed with a canopy and stairs. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).

    240 m away · filed Jul 28, 2025 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.