Toronto address · Ward 5, York South-Weston
8 Beechwood Ave
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
New house · New building
REV 01: revised height of sunken entrance & interior revisions as noted with clouds & notesProposal to construct a 2 storey single family dwelling with finished basement and integral garage.
Applied Jul 20, 2018 · issued Dec 3, 2018 · completed Aug 19, 2019 · Permit 17 102392 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to construct a 2 storey single family dwelling with finished basement and integral garage.
Applied Jul 19, 2018 · issued Aug 2, 2018 · completed Jun 26, 2019 · Permit 17 102392 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a 2 storey single family dwelling with finished basement and integral garage.
Applied Jan 9, 2017 · issued Nov 3, 2017 · completed Jul 15, 2019 · Permit 17 102392 PLB
- Closed
New house · New building
Proposal to construct a 2 storey single family dwelling with finished basement and integral garage.
Applied Jan 9, 2017 · issued Nov 3, 2017 · completed Aug 19, 2019 · 1 home added · Permit 17 102392 BLD
- Closed
Demolition
Proposal to demolish the existing 1 storey frame garage.
Applied Jan 9, 2017 · issued Mar 16, 2018 · completed Jun 21, 2018 · Permit 17 102416 DEM
- Closed
Drains and site services
Drain - Proposal to construct a 2 storey single family dwelling with finished basement and integral garage.
Applied Jan 9, 2017 · issued Nov 3, 2017 · completed Jun 25, 2019 · Permit 17 102392 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To legalize and to maintain the existing as-built detached dwelling with an attached garage. A previous Committee of Adjustment application (A0764/16EYK) approved a new detached dwelling with an attached garage with variances relating to floor space index, side yard setbacks, rear yard setbacks, first floor height, setback to the eaves, maximum number of platforms, platform size, and landscaping.
Decision: Approved (hearing Nov 8, 2018)
Filed Sep 21, 2018 · File A0711/18EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
63 Astoria Ave · Minor variance
To construct a second and third storey addition above the existing dwelling, a three-storey rear addition, a new attached garage with a second storey above, and to convert the property into a duplex. The existing detached garage in the rear will be demolished.
190 m away · filed Feb 12, 2026 · Approved
136 Lambton Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
210 m away · filed Apr 29, 2025 · Approved
136 Lambton Ave · Minor variance
To construct a new semi-detached fourplex with a garden suite in the rear yard.
210 m away · filed Apr 29, 2025 · Approved
136 Lambton Ave · Minor variance
To construct a new semi-detached fourplex with a garden suite in the rear yard.
210 m away · filed Apr 29, 2025 · Approved
36 Chryessa Ave · Minor variance
To legalize and to maintain the existing front porch.
150 m away · filed Feb 21, 2025 · Approved
25 Beechwood Ave · Minor variance
To construct a new detached fourplex.
70 m away · filed Nov 15, 2024 · Approved
36 Gray Ave · Minor variance
To construct a new detached dwelling with an attached garage.
120 m away · filed Jul 6, 2024 · Approved
55 Astoria Ave · Minor variance
To construct a new detached dwelling with a detached garage, as well as a deck in the rear yard. A previous Committee of Adjustment application (A0294/23EYK) approved variances related to front yard setback, side yard setback, dwelling length, rear yard soft landscaping, ancillary building height, ancillary building coverage, and ancillary building floor area.
230 m away · filed Apr 26, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.