Toronto address · Ward 25, Scarborough-Rouge Park
8 Gladys Rd
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to existing single family dwelling. Scope of work includes finishing basement, and a conversion to a 2 unit dwelling, as well as minor ground floor alterations
Applied Jan 31, 2018 · issued Feb 6, 2018 · completed Nov 23, 2018 · Permit 17 248056 HVA
- Closed
Plumbing
Plumbing - Proposal for interior alterations to existing single family dwelling. Scope of work includes finishing basement, and a conversion to a 2 unit dwelling, as well as minor ground floor alterations
Applied Oct 16, 2017 · issued Dec 14, 2017 · completed Nov 23, 2018 · Permit 17 248056 PLB
- Closed
Small residential project · Interior alterations
Proposal for interior alterations to existing single family dwelling. Scope of work includes finishing basement, and a conversion to a 2 unit dwelling, as well as minor ground floor alterations
Applied Oct 16, 2017 · issued Dec 14, 2017 · completed Nov 23, 2018 · 1 home added · Permit 17 248056 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
41 Bobmar Rd · Minor variance
To construct a new two-storey ancillary building containing a garden suite with basement, a rear basement walkout, and a second-storey front balcony in the rear yard of a lot containing an existing two-storey detached main dwelling. There will be a total of two units on the lot.
220 m away · filed Apr 25, 2025 · Approved
28 Bobmar Rd · Minor variance
To demolish existing dwelling and to construct a new two-storey detached dwelling and a two-storey garden suite.
160 m away · filed Mar 3, 2023 · Approved
38 Bobmar Rd · Minor variance
To construct a new dwelling. Note this application was deferred at the February 16, 2023 hearing to allow the applicant the opportunity to meet with Urban Forestry.
170 m away · filed Nov 28, 2022 · Approved
1407 Military Trl · Minor variance
To construct a rear second floor solarium addition and a new rear ground floor deck.
210 m away · filed Mar 22, 2021 · Approved
1379 Military Trl · Minor variance
To create a second residential unit in the basement of existing detached dwelling.
80 m away · filed Jan 8, 2021 · Approved
1361 Military Trl · Minor variance
To demolish the existing dwellings and permit the construction of a new two-storey detached dwelling (one dwelling per lot). The two properties are to be severed into three lots (PART 1-LOT TO BE RETAINED), (PARTS 3 & 5 -LOT TO BE CONVEYED) (PART 7-LOT TO BE CONVEYED). Cross Reference Consent Application B0026/20SC.
190 m away · filed Jul 13, 2020 · Approved
1361 Military Trl · Consent
To sever the properties into 3 lots (PART 1-LOT TO BE RETAINED), (PARTS 3 & 5 -LOT TO BE CONVEYED) (PART 7-LOT TO BE CONVEYED) All lots are proposed to have minimum lot frontages of 17.26 metres lot frontages and lot areas of 808 square metres. Each of the proposed lots are to be developed with a new, two-storey detached dwelling requiring variances to the Zoning By-law(s). Cross-Reference Minor Variance Applications A0156/20SC (PART1), A163/20SC (PARTS 3 and 5) and A164/20SC. (PART 7).
190 m away · filed Jul 13, 2020 · Approved
1361 Military Trl · Minor variance
To demolish the existing dwelling and permit the construction of a new, two-storey detached dwelling. Cross Reference Consent Application B0026/20SC.
190 m away · filed Jul 13, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.