Toronto address · Ward 17, Don Valley North
8 Skyview Cres
The City of Toronto has 7 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revison 02 - WIDEN STAIRS; NEW WINDOW SIZES IN BASEMENT AND GROUND; NEW WET BAR LOCATION IN BASEMENT; NEW CONFIGURATION OF SECOND FLOOR; CHANGES IN FRONT AND REAR ELEVATIONS, NEW STRUCTURAL DRAWINGSREVISION - interior layout changes in the basementProposal to construct a new two storey rear addition, new deck, new basement walkout and new front porch
Applied Nov 15, 2016 · issued Dec 8, 2016 · completed Aug 25, 2017 · Permit 15 255276 BLD (revision 02)
- Closed
Plumbing
REVISION - interior layout changes in the basementPlumbing - Proposal to construct a new two storey rear addition, new deck, new basement walkout and new front porch
Applied Oct 3, 2016 · issued Oct 11, 2016 · completed Aug 25, 2017 · Permit 15 255276 PLB (revision 01)
- Closed
Small residential project · Multiple projects
REVISION - interior layout changes in the basementProposal to construct a new two storey rear addition, new deck, new basement walkout and new front porch
Applied Oct 3, 2016 · issued Oct 11, 2016 · completed Aug 25, 2017 · Permit 15 255276 BLD (revision 01)
- Closed
Drains and site services · Back water valve (Sewer only)
install 1 backwater valve
Applied May 4, 2016 · issued May 4, 2016 · completed Jun 16, 2017 · Permit 16 150403 DRN
- Closed
Heating and ventilation
HVAC - Proposal to construct a new two storey rear addition, new deck, new basement walkout and new front porch
Applied Dec 4, 2015 · issued Jan 7, 2016 · completed Jul 14, 2017 · Permit 15 255276 HVA
- Closed
Small residential project · Multiple projects
Proposal to construct a new two storey rear addition, new deck, new basement walkout and new front porch
Applied Nov 23, 2015 · issued Dec 18, 2015 · completed Aug 25, 2017 · Permit 15 255276 BLD
- Closed
Plumbing
Plumbing - Proposal to construct a new two storey rear addition, new deck, new basement walkout and new front porch
Applied Nov 23, 2015 · issued Dec 18, 2015 · completed Aug 25, 2017 · Permit 15 255276 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
60 Skyview Cres · Minor variance
Proposal to construct a new 2-storey dwelling
240 m away · filed Mar 24, 2022 · Approved
24 Deepglade Cres · Minor variance
To construct a rear basement walkout, a west side staircase enclosure at the basement and ground floor levels and a new second storey.
240 m away · filed Apr 15, 2021 · Approved
20 Parfield Dr · Minor variance
To construct a second floor addition,, and a new covered porch.
230 m away · filed Oct 7, 2020 · Approved
23 Parfield Dr · Minor variance
To construct a second storey addition over the attached garage of the existing dwelling, in conjunction with other interior and exterior alterations.
220 m away · filed Sep 22, 2020 · Approved
18 Parfield Dr · Minor variance
To construct a second storey addition on the existing dwelling
210 m away · filed Apr 3, 2019 · Approved
15 Skyview Cres · Minor variance
To construct a new covered porch to the east portion of the existing dwelling, in conjunction with a new canopy to front of the dwelling.
80 m away · filed May 5, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.