Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

8 Sydenham St

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Deck

    Proposal for a new rear deck at the rear of an existing SFD-townhouse.See also 01 130314 WNP

    Applied Aug 15, 2025 · issued Sep 11, 2025 · completed Oct 10, 2025 · Permit 25 210820 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 358 Queen St E · Minor variance

    To convert the second and third levels from residential units into commercial use(s).

    120 m away · filed Aug 24, 2023 · Approved

  • 351 Queen St E · Minor variance

    To alter the approved mixed-use development by increasing the height of the building that consists of 10, 12, 13 and 27-storeys, as shown on the Revised Diagram 3. Also, to increase both the total and residential gross floor areas, and to reduce the non-residential gross floor area, the number of vehicular parking spaces, and the residential amenity spaces.

    170 m away · filed Aug 23, 2023 · Approved

  • 387 Shuter St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear third storey terrace.

    90 m away · filed Apr 20, 2022 · Approved

  • 359 Shuter St · Minor variance

    To construct a new three-storey, two-unit townhouse with a front porch, a front basement walkout, a rear ground floor deck, a rear second storey balcony and a rear third storey terrace. The existing one-and-one-half-storey townhouse will be demolished.

    20 m away · filed Feb 8, 2022 · Approved

  • 335 Queen St E · Consent

    To obtain consent for a technical severance to re-establish three lots which merged on title.

    220 m away · filed Dec 29, 2020 · Approved

  • 335 Queen St E · Consent

    220 m away · filed Dec 29, 2020 · Application withdrawn

  • 209 Berkeley St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition.

    240 m away · filed Mar 11, 2020 · Approved

  • 29 Tracy St · Minor variance

    To alter the existing three-storey semi-detached dwelling by adding a rear third storey addition (greenhouse).

    70 m away · filed Jan 30, 2020 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.