Toronto address · Ward 19, Beaches-East York
8 Warvet Cres
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services
Drain - Proposed basement finishing of existing basement and crawl space area, new steel beam, new basement bathroom (existing drain rough-ins completed under previous building permit), new rear yard window well. No proposed work to existing ground or second floor levels.
Applied Oct 6, 2022 · issued Oct 24, 2022 · completed Feb 22, 2023 · Permit 22 214195 DRN
- Closed
Plumbing
Plumbing - Proposed basement finishing of existing basement and crawl space area, new steel beam, new basement bathroom (existing drain rough-ins completed under previous building permit), new rear yard window well. No proposed work to existing ground or second floor levels.
Applied Oct 6, 2022 · issued Oct 24, 2022 · completed Feb 17, 2023 · Permit 22 214195 PLB
- Closed
Small residential project · Finishing basements
Proposed basement finishing of existing basement and crawl space area, new steel beam, new basement bathroom (existing drain rough-ins completed under previous building permit), new rear yard window well. No proposed work to existing ground or second floor levels.
Applied Oct 6, 2022 · issued Oct 17, 2022 · completed Feb 17, 2023 · Permit 22 214195 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
59 Squires Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition with a rear covered balcony, and a secondary suite within the basement. Also, to construct a carport along the south side of the dwelling.
240 m away · filed Feb 15, 2024 · Approved
24 Merritt Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage and an oversized driveway. Also, to construct a one-storey ancillary building (garden suite) in the rear yard.
120 m away · filed Mar 14, 2023 · Withdrawn
8 Plaxton Cres · Minor variance
To construct a new two-storey detached dwelling with a front porch, an integral garage, a rear ground floor covered patio, and a side basement walkout.
250 m away · filed Nov 10, 2022 · Approved
29 Furnival Rd · Minor variance
To construct a new one-and-one-half-storey ancillary building (garden suite), in the rear yard of the existing one-and-one-half-storey detached dwelling.
220 m away · filed Oct 26, 2022 · Approved
2915 St Clair Ave E · Minor variance
Proposing to add a vehicle dealership that would use 3/7 parking spaces on the existing lot. The existing autobody repair shop is a legal non-conforming use.
250 m away · filed Oct 3, 2022 · Postponed
24 Merritt Rd · Minor variance
Proposed to build a Garden Suite on the rear of the lot.(New house w/secondary suite MV application: 22 210420 STE 19 MV)
120 m away · filed Sep 28, 2022 · Accepted
24 Merritt Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a covered front porch, a front basement walkout to access the secondary suite within the basement, a front second storey balcony, and a rear first storey deck. Also, to construct a one-storey ancillary building (garden suite) in the rear yard. The existing detached garage will be demolished.
120 m away · filed Sep 28, 2022 · Refused
70 Squires Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage and a covered front porch.
220 m away · filed Apr 6, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.