Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

80 Barker Ave

The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal to construct a new 2 storey single family dwelling with a finished basement with walkout, rear deck, and second floor balcony.

    Applied Feb 21, 2023 · issued Feb 28, 2023 · completed Jul 12, 2023 · Permit 22 122476 HVA

    Closed
  • Plumbing

    Revision 01. Plumbing - Proposal to construct a new 2 storey single family dwelling with a finished basement with walkout, rear deck, and second floor balcony.

    Applied Aug 12, 2022 · issued Aug 22, 2022 · completed Jul 12, 2023 · Permit 22 122476 PLB (revision 01)

    Closed
  • New house · New building

    Revision 01. Changes to floor plans and main floor deck. Proposal to construct a new 2 storey single family dwelling with a finished basement with walkout, rear deck, and second floor balcony.

    Applied Aug 12, 2022 · issued Dec 7, 2022 · completed Oct 16, 2025 · 1 home added · Permit 22 122476 BLD (revision 01)

    Closed
  • Drains and site services

    Drain - Proposal to construct a new 2 storey single family dwelling with a finished basement with walkout, rear deck, and second floor balcony.

    Applied Mar 14, 2022 · issued Jun 14, 2022 · completed Oct 16, 2025 · Permit 22 122476 DRN

    Closed
  • New house · New building

    Proposal to construct a new 2 storey single family dwelling with a finished basement with walkout, rear deck, and second floor balcony.

    Applied Mar 14, 2022 · issued Jun 14, 2022 · completed Oct 16, 2025 · 1 home added · Permit 22 122476 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to construct a new 2 storey single family dwelling with a finished basement with walkout, rear deck, and second floor balcony.

    Applied Mar 14, 2022 · issued Jun 14, 2022 · completed Jul 12, 2023 · Permit 22 122476 PLB

    Closed
  • Demolition

    Proposal to demolish existing 1 storey dwelling to construct a new 2 storey single family dwelling.

    Applied Mar 14, 2022 · issued Jun 16, 2022 · completed Oct 21, 2022 · 1 home removed · Permit 22 122529 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with a balcony at the front of the second storey, a rear basement walkout, and a deck at the rear of the ground floor.

    Decision: Approved with conditions (hearing Apr 28, 2021)

    Filed Jan 7, 2021 · File A0064/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 109 Virginia Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 109 Virginia Ave · Minor variance

    To construct a new two-storey semi-detached dwelling with a front integral garage, a front covered porch with stairs, a rear second storey deck with stairs, and a rear basement walkout. There will be a total of one residential dwelling unit on this lot.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 111 Virginia Ave · Minor variance

    To construct a new two-storey semi-detached dwelling with a front integral garage, a front covered porch with stairs, a rear second storey deck with stairs, and a rear basement walkout. There will be a total of one residential dwelling unit on this lot.

    130 m away · filed Feb 11, 2026 · Hearing scheduled

  • 111 Virginia Ave · Minor variance

    To construct a new two-storey semi-detached dwelling with a front integral garage, a front covered porch with stairs, a rear second storey deck with stairs, and a rear basement walkout. There will be a total of one residential dwelling unit on this lot.

    130 m away · filed Feb 11, 2026 · Hearing scheduled

  • 111 Virginia Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    130 m away · filed Feb 11, 2026 · Hearing scheduled

  • 109 Virginia Ave · Minor variance

    To construct a new two-storey semi-detached dwelling with a front integral garage, a front covered porch with stairs, a rear second storey deck with stairs, and a rear basement walkout. There will be a total of one residential dwelling unit on this lot.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 226 Glebemount Ave · Minor variance

    To alter the existing two-storey detached dwelling (basement level is considered the first level) by constructing a two-storey addition along the south side wall and rear wall (including a basement extension), a complete third storey addition (with dormers), a front integral garage, a covered front porch with stairs, a rear first floor balcony, and a rear walkout basement. The existing rear one-storey ancillary building (detached garage) will be demolished.

    140 m away · filed Jan 21, 2026 · Approved

  • 47 Dunkirk Rd · Minor variance

    To permit a new two-storey detached dwelling (duplex) with a front covered porch, a front canopy over the ground floor, a rear ground floor deck with stairs, and a rear basement walkout, which was constructed beyond the limits of an authorized building permit.

    150 m away · filed Nov 24, 2025 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.