Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

80 Bude St

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed demolition of existing house and building new two storey single family dwelling.

    Applied Mar 23, 2023 · issued May 15, 2023 · completed Jan 23, 2024 · Permit 23 126302 HVA

    Closed
  • Plumbing

    Plumbing - Proposed demolition of existing house and building new two storey single family dwelling.

    Applied Mar 23, 2023 · issued May 15, 2023 · completed Jan 23, 2024 · Permit 23 126302 PLB

    Closed
  • New house · New building

    Proposed demolition of existing house and building new two storey single family dwelling.

    Applied Mar 23, 2023 · issued May 15, 2023 · completed May 21, 2026 · 1 home added · Permit 23 126302 BLD

    Closed
  • Demolition

    Proposed Demolition of the existing single family dwelling.

    Applied Mar 23, 2023 · issued May 15, 2023 · completed Feb 2, 2024 · Permit 23 126331 DEM

    Closed
  • Drains and site services

    Drain - Proposed demolition of existing house and building new two storey single family dwelling.

    Applied Mar 23, 2023 · issued May 15, 2023 · completed Jan 23, 2024 · Permit 23 126302 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling with an integral garage and a raised rear deck with a basement walkout.

    Decision: Approved (hearing Sep 21, 2022)

    Filed Jun 20, 2022 · File A0711/22TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 52 Bude St · Minor variance

    To construct a new three-storey detached dwelling with a front integral garage, a front porch with stairs and a canopy, a rear basement walkout, and a rear first level deck.

    160 m away · filed Aug 4, 2026 · Hearing scheduled

  • 88 Bude St · Minor variance

    20 m away · filed May 14, 2026 · Postponed

  • 39 Lanark Ave · Minor variance

    To alter the existing one-and-half-storey detached dwelling by constructing a new rear two-storey addition (with a basement extension below including a new secondary suite) with a front porch with stairs, a new front integral garage, a rear basement walkout, a rear first floor deck with stairs, and a rear second floor balcony. The existing front porch and rear one-storey addition will be demolished. Also, the roof will be altered and raised from a pitched roof to a flat roof. The existing rear detached garage will be maintained and unaltered.

    230 m away · filed Nov 5, 2025 · Approved

  • 636 Vaughan Rd · Minor variance

    To construct a new patio (for the existing eating establishment) in the rear yard of the existing two-storey mixed-use building. Also, to construct a canopy for the new patio in the rear yard.

    230 m away · filed Oct 21, 2025 · Postponed

  • 571 Oakwood Ave · Minor variance

    To construct a new three-storey apartment building containing 10 residential dwelling units, with a covered front entrance at the northwest portion of the building, 6 rooftop terraces (located at the northwest, northeast, southeast, southwest, and side (south) portions of the building above the third floor) with one rooftop staircase access enclosure. Also, to construct a one-storey detached ancillary building (bicycle storage shed) in the rear yard. The existing rear shed will be demolished.

    140 m away · filed Sep 30, 2025 · Approved

  • 587 Oakwood Ave · Minor variance

    To alter the rear two-storey semi-detached ancillary building (as previously approved under Minor Variance Decision A0260/24TEY), by increasing the overall building height. This ancillary building will contain one garden suite, a basement level, and a storage area located within the basement level (to be accessed from a front walkout only). There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit within the ancillary building, both buildings currently under construction).

    220 m away · filed Sep 8, 2025 · Withdrawn

  • 587 Oakwood Ave · Minor variance

    To alter the rear two-storey semi-detached ancillary building (as previously approved under Minor Variance Decision A0262/24TEY), by increasing the overall building height. This ancillary building will contain one garden suite, a basement level, and a storage area located within the basement level (to be accessed from a front walkout only). There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit within the ancillary building, both buildings currently under construction).

    220 m away · filed Sep 8, 2025 · Withdrawn

  • 587 Oakwood Ave · Minor variance

    To alter the rear two-storey detached ancillary building (as previously approved under Minor Variance Decision A0261/24TEY), by increasing the overall building height. This ancillary building will contain one garden suite, a basement level, and a storage area located within the basement level (to be accessed from a front walkout only). There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit within the ancillary building, both buildings currently under construction).

    220 m away · filed Sep 8, 2025 · Withdrawn

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.