Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

80 Guestville Ave

The City of Toronto has 8 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Piping: other buildings

    REVISION - to include Domestic Water Riser workProposal for drainage stack piping replacement.

    Applied Dec 16, 2025 · issued Jan 5, 2026 · Permit 25 162360 PSA (revision 01)

    Revision issued
  • Plumbing · Piping: other buildings

    Proposal for drainage stack piping replacement.

    Applied May 20, 2025 · issued Aug 11, 2025 · Permit 25 162360 PSA

    Permit issued
  • Addition or alteration · Interior alterations

    Interior alteration - removal of non structural wall in the basement of the existing apartment building

    Applied Dec 11, 2023 · issued Jan 24, 2024 · completed Nov 22, 2024 · Permit 23 234612 BLD

    Cancelled
  • Plumbing

    Plumbing - proposing interior alterations and HVAC

    Applied Dec 5, 2023 · issued Feb 9, 2024 · completed Mar 26, 2026 · Permit 23 232843 PLB

    Closed
  • Addition or alteration · Interior alterations

    proposing interior alterations addition of dwelling unit and HVAC

    Applied Dec 5, 2023 · issued Jan 29, 2024 · completed Apr 30, 2026 · Permit 23 232843 BLD

    Closed
  • Heating and ventilation

    HVAC - proposing interior alterations and HVAC

    Applied Dec 5, 2023 · issued Jan 29, 2024 · completed Oct 3, 2025 · Permit 23 232843 HVA

    Closed
  • Addition or alteration · Interior alterations

    proposing removal of non-load bearing wall in the kitchen

    Applied Nov 7, 2023 · issued Dec 6, 2023 · completed Nov 22, 2024 · Permit 23 223316 BLD

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    installation of one backflow prevention device

    Applied Aug 9, 2011 · issued Aug 17, 2011 · completed Apr 21, 2021 · Permit 11 253961 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 102 Guestville Ave · Consent

    To obtain consent to sever the lot into two residential lots and to construct a pair of semi-detached fourplexes with garden suites in the rear yards.

    130 m away · filed Dec 16, 2025 · Approved

  • 102 Guestville Ave · Minor variance

    To construct a new semi-detached fourplex with a garden suite in the rear yard.

    130 m away · filed Dec 16, 2025 · Approved

  • 102 Guestville Ave · Minor variance

    To construct a new semi-detached fourplex with a garden suite in the rear yard.

    130 m away · filed Dec 16, 2025 · Approved

  • 72 Lambton Ave · Minor variance

    To construct a second storey addition above the existing dwelling, a one storey front addition, a two storey rear addition, and a deck in the rear yard.

    140 m away · filed May 15, 2024 · Approved

  • 24 York Ave · Minor variance

    To construct a second storey addition above the existing dwelling and a two-storey rear addition.

    180 m away · filed Oct 27, 2022 · Approved

  • 26 Syndicate Ave · Minor variance

    To construct a third storey addition above the existing dwelling, new three storey rear and front additions, a new rear deck and new front porch.

    200 m away · filed Jul 21, 2021 · Approved

  • 10 York Ave · Consent

    To obtain consent for technical severance of the property for the purpose of re-establishing two separate lots.

    240 m away · filed Jul 14, 2021 · Hearing scheduled

  • 17 Dennis Ave · Minor variance

    To construct a new three-storey elementary school.

    230 m away · filed Mar 5, 2021 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.