Toronto address · Ward 19, Beaches-East York
80 Hubbard Blvd
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Interior alterations
REV01: changes to front porch railing
Applied Dec 18, 2019 · issued Jan 3, 2020 · completed May 31, 2022 · Permit 19 158180 BLD (revision 01)
- Closed
Heating and ventilation
Rev 01: Revision to remove the A/C ductingHVAC - Interior alterations to the ground and third floors
Applied Nov 28, 2019 · issued Dec 4, 2019 · completed May 31, 2022 · Permit 19 158180 HVA (revision 01)
- Closed
Drains and site services
Drain - Interior alterations to the ground and third floors
Applied Oct 1, 2019 · issued Oct 1, 2019 · completed May 21, 2020 · Permit 19 158180 DRN
- Closed
Heating and ventilation
HVAC - Interior alterations to the ground and third floors
Applied Oct 1, 2019 · issued Oct 9, 2019 · completed May 31, 2022 · Permit 19 158180 HVA
- Closed
Plumbing
REV01: added fixture.
Applied Aug 27, 2019 · issued Aug 28, 2019 · completed May 31, 2022 · Permit 19 158180 PLB (revision 01)
- Closed
Plumbing
Plumbing - Interior alterations to the ground and third floors
Applied May 23, 2019 · issued Jun 7, 2019 · completed May 31, 2022 · Permit 19 158180 PLB
- Closed
Small residential project · Interior alterations
Interior alterations to the ground and third floors
Applied May 23, 2019 · issued Jun 7, 2019 · completed May 31, 2022 · Permit 19 158180 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To alter the existing two-storey detached dwelling by constructing a rear deck with side privacy screens, a rear detached shed, and converting rear parking space into soft landscaping.
Decision: Approved (hearing Mar 3, 2021)
Filed Mar 9, 2020 · File A0290/20TEY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
25 Selwood Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard.
50 m away · filed Sep 1, 2026 · Postponed
34 Balsam Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.
190 m away · filed Aug 25, 2025 · Approved
29 Maclean Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front third storey addition (for habitable space).
100 m away · filed Jul 30, 2025 · Approved
32 Fernwood Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition, a rear first level deck, and rear and side (south) basement walkouts. The front porch will be reconstructed with a canopy and stairs. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).
250 m away · filed Jul 28, 2025 · Approved
34 Fernwood Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing an integral garage, a partial third storey addition, a rear basement walkout, and a rear first level deck. The front porch will be reconstructed with a canopy and stairs. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).
240 m away · filed Jul 28, 2025 · Approved
34 Fernwood Park Ave · Minor variance
To alter the existing three-storey semi-detached duplex dwelling (basement level is considered the first storey) by constructing an integral garage, a partial fourth storey addition, a rear second level deck, a raised front porch with stairs and canopy, and front and rear basement walkouts. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the second, third, and fourth levels).
240 m away · filed Jun 2, 2025 · Refused
32 Fernwood Park Ave · Minor variance
To alter the existing three-storey semi-detached duplex dwelling (basement level is considered the first storey) by constructing a partial fourth storey addition, a rear second level deck, a raised front porch with stairs and canopy (to replace the lawfully existing front porch), and front and rear basement walkouts. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the…
250 m away · filed Jun 2, 2025 · Refused
14 Hammersmith Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (fourplex). Also, the existing ancillary building (carport for two parking spaces) will be maintained and unaltered. The rear shed will be demolished.
250 m away · filed May 13, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.