Toronto address · Ward 9, Davenport
80 Pauline Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed (dormant)
Plumbing · Unknown
Remove main trap install 4" cleanout
Applied May 13, 1998 · issued May 13, 1998 · completed Jun 8, 2026 · Permit 98 016604 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
1167-1175 Bloor Street West, 34-42 Brock Crescent and 90 Croatia Street
14 storeys · 52 homes · Mixed use
320 m away · Rezoning · Approved · filed Feb 9, 2026
- Under review
1141 Bloor Street West, 90 Croatia Street and 980 Dufferin Street
22 storeys · 264 homes · Mixed use
320 m away · Site plan · Under review · filed Feb 27, 2026
Neighbours’ Committee of Adjustment files within 250 m
57 Emerson Ave · Minor variance
To construct a new one-storey ancillary building (sitting area/workshop and sauna), with a covered porch (located at the southwest corner of the building), in the rear yard. The existing one-storey ancillary detached building (garage) will be demolished.
220 m away · filed Jun 3, 2026 · Approved
111 Emerson Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front ground floor deck with stairs and privacy screening (located beyond the existing front enclosed porch).
250 m away · filed Feb 24, 2026 · Approved
750 Brock Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition.
160 m away · filed Sep 12, 2025 · Approved
1081 Dufferin St · Minor variance
To construct a new one-storey detached ancillary building (two-car garage), in the rear yard of the existing two-storey detached dwelling.
240 m away · filed May 20, 2025 · Approved
428 Margueretta St · Minor variance
To convert the existing two-and-one-half-storey detached dwelling into a fourplex by constructing a front basement walkout, and new rear ground floor stairs (the existing rear ground floor deck and stairs will be demolished). There will be a total of five dwelling units on this lot (four units within the main dwelling, and one dwelling unit within the rear detached ancillary building (garden suite, approved under an authorized building permit)).
170 m away · filed Sep 25, 2024 · Approved
1064 Dufferin St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling (duplex) by converting the existing rear one-storey ancillary building (detached garage) into one garden suite. There will be a total of three residential dwelling units on this lot (two units within the dwelling and one unit within the ancillary building).
220 m away · filed Jul 19, 2024 · Approved
41 Wallace Ave · Minor variance
To convert the existing three-storey detached dwelling into a fourplex by constructing a rear three-storey addition, front and rear third storey balconies, a rear second storey balcony, and a rear ground floor deck. The existing front second storey balcony will be maintained. There will be a total of four residential dwelling units on this lot.
160 m away · filed Jun 3, 2024 · Approved
1119 Dufferin St · Minor variance
To construct a new three-storey detached dwelling (triplex) with rear decks on the ground, second, and third levels, a front third storey rooftop terrace above the front cantilevered second storey portion of the dwelling, and a front landing with stairs.
250 m away · filed Mar 4, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.