Toronto address · Ward 21, Scarborough Centre
80 Progress Ave
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Plumbing
Plumbing - Proposal for raising a portion (200'by48') of the existing roof for 13'
Applied Jul 19, 2021 · issued Sep 7, 2021 · Permit 21 186102 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for raising a portion (200'by48') of the existing roof for 13'
Applied Jul 19, 2021 · issued Sep 7, 2021 · Permit 21 186102 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for raising a portion (200'by48') of the existing roof for 13'
Applied Jul 19, 2021 · issued Sep 7, 2021 · Permit 21 186102 HVA
- Inspections under way
Drains and site services · Site service
Proposed installation of new sanitary maintenance access hole over existing 150 mm sanitary sewer line - Atlantic Packaging Products Ltd
Applied Apr 7, 2015 · issued Apr 22, 2015 · Permit 15 137267 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
1 William Kitchen Rd · Minor variance
This application is for a proposal to reduce the parking requirement for the Kennedy Commons power centre. The zoning by-law requires parking to be provided at a minimum rate of 4.8 spaces/100 m2 of total gross floor area for financial institutions, personal service shop, restaurants, retail stores including lumber yards, building supply warehouses & places of entertainment, and 5.0 spaces/100 m2 for a fitness centre. The owners are requesting a variance to establish a new uniform rate of 3.8 spaces/100 m2 of total gross floor area.
250 m away · filed Apr 30, 2014 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.