Toronto address · Ward 1, Etobicoke North
80 Royalcrest Rd
The City of Toronto has 6 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Addition or alteration · Multiple projects
Rev 01: Revision to the location of the washrooms as shown in the bubbled drawingsInterior alteration of existing warehouse to be converted into a place of worship and enclosure of existing loading dock into a new vestibule. eliminating and reinforcing columns
Applied Apr 4, 2019 · issued Jun 1, 2020 · Permit 09 187530 BLD (revision 01)
- Ready for issuance
Fire and security upgrade
FS - Sprinkler Shop Drawing - Interior alteration of existing warehouse to be converted into a place of worship and enclosure of existing loading dock into a new vestibule. eliminating and reinforcing columns
Applied Mar 21, 2012 · completed Jun 1, 2020 · Permit 09 187530 FSU
- Work not started
Heating and ventilation
HVAC - Interior alteration of existing warehouse to be converted into a place of warship and enclosure of existing loading dock into a new vestibule with installation of one kitchen exhaust system.
Applied Nov 12, 2009 · issued Apr 18, 2012 · Permit 09 187530 HVA
- Inspections under way
Addition or alteration · Multiple projects
Interior alteration of existing warehouse to be converted into a place of worship and enclosure of existing loading dock into a new vestibule. eliminating and reinforcing columns
Applied Nov 12, 2009 · issued Apr 11, 2012 · Permit 09 187530 BLD
- Inspections under way
Plumbing
Plumbing - Interior alteration of existing warehouse to be converted into a place of warship and enclosure of existing loading dock into a new vestibule.
Applied Nov 12, 2009 · issued Apr 18, 2012 · Permit 09 187530 PLB
- Permit issued
Drains and site services · Inside and outside drains
Drain - Interior alteration of existing warehouse to be converted into a place of worship and enclosure of existing loading dock into a new vestibule.
Applied Nov 12, 2009 · issued Apr 11, 2012 · Permit 09 187530 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.