Toronto address · Ward 11, University-Rosedale
80 St George St
The City of Toronto has 19 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Hvac - interior renovation to create 2 seperate computer labs from one existing computer lab (seperated by operable partition). Relocate entrance of labs to corridor 122k. Existing 1hr frr separations to be maintained. Associated mechanical, electrical and structural.
Applied Feb 3, 2023 · issued Apr 3, 2023 · completed Jan 2, 2026 · Permit 23 110013 HVA
- Closed
Addition or alteration · Interior alterations
Interior renovation to create 2 seperate computer labs from one existing computer lab (seperated by operable partition). Relocate entrance of labs to corridor 122k. Existing 1hr frr separations to be maintained. Associated mechanical, electrical and structural.
Applied Feb 3, 2023 · issued Apr 3, 2023 · completed Mar 11, 2026 · Permit 23 110013 BLD
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to provide new laboratory - Unit LM601
Applied Nov 23, 2022 · issued Dec 6, 2022 · Permit 22 232363 BLD
- Closed
Heating and ventilation
HVAC - Proposed interior alterations to provide new laboratory - Unit LM601
Applied Nov 23, 2022 · issued Dec 21, 2022 · completed Oct 29, 2024 · Permit 22 232363 HVA
- Closed
Plumbing
Plumbing - Proposed interior alterations to provide new laboratory - Unit LM601
Applied Nov 23, 2022 · issued Dec 21, 2022 · completed May 13, 2026 · Permit 22 232363 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to two laboratories for existing university.
Applied May 31, 2022 · issued Jun 14, 2022 · completed Apr 9, 2026 · Permit 22 154195 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to two laboratories for existing university.
Applied May 31, 2022 · issued Jun 27, 2022 · completed Aug 26, 2025 · Permit 22 154195 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to two laboratories for existing university.
Applied May 31, 2022 · issued Jun 27, 2022 · completed Jul 14, 2025 · Permit 22 154195 HVA
- Closed
Temporary structure · Certified tents
Installation of four 10 by 100 x8 ft frame tents ( Cert #14-219356) anchored using concrete weights.Installed on May 28th and Removal May 28th 2022
Applied May 12, 2022 · issued May 30, 2022 · completed Sep 16, 2025 · Permit 22 146183 TPS
- Closed
Drains and site services
Drain - Interior alterations to an existing clinical laboratory space
Applied Apr 13, 2021 · issued Apr 30, 2021 · completed Mar 25, 2026 · Permit 21 115993 DRN
- Closed
Plumbing
Plumbing - Interior alterations to an existing clinical laboratory space
Applied Apr 13, 2021 · issued Apr 30, 2021 · completed Mar 25, 2026 · Permit 21 115993 PLB
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to an existing clinical laboratory space
Applied Feb 12, 2021 · issued Feb 23, 2021 · Permit 21 115993 BLD
Show 7 more permits
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to existing lab in basement
Applied Jul 31, 2020 · issued Aug 13, 2020 · completed Feb 28, 2024 · Permit 20 175477 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations to existing lab in basement
Applied Jul 31, 2020 · issued Sep 10, 2020 · completed Feb 9, 2024 · Permit 20 175477 PLB
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to existing lab in basement
Applied Jul 31, 2020 · issued Sep 10, 2020 · completed Jan 26, 2024 · Permit 20 175477 HVA
- Revision issued
Plumbing
Revision to originally approved plumbing.
Applied Dec 14, 2018 · issued Jan 24, 2019 · Permit 18 168069 PLB (revision 01)
- Closed
Heating and ventilation
HVAC - Proposed interior alterations to convert an existing storage space into office use on the 6th floor.
Applied May 30, 2018 · issued Jul 16, 2018 · completed May 13, 2026 · Permit 18 168069 HVA
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations to convert an existing storage space into office use on the 6th floor.
Applied May 30, 2018 · issued Jul 16, 2018 · Permit 18 168069 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to convert an existing storage space into office use on the 6th floor.
Applied May 30, 2018 · issued Jun 28, 2018 · Permit 18 168069 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
191-199 College Street and 74-76 Henry Street
31 storeys · 492 homes · Mixed use
430 m away · Site plan · Under review · filed Aug 28, 2022
- Under review
9 storeys · 109 homes · Mixed use
440 m away · Site plan · Under review · filed Apr 20, 2022
Neighbours’ Committee of Adjustment files within 250 m
70 St George St · Minor variance
To alter the existing building by constructing a three-storey addition above the one-storey portion of the building.
60 m away · filed Aug 1, 2023 · Approved
110 St George St · Minor variance
To alter the existing institutional building by constructing a new rooftop cooling tower and ductwork. A concurrent Site Plan application is being processed (05 133284 STE).
160 m away · filed Sep 14, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.