Toronto address · Ward 11, University-Rosedale
809 Shaw St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision to add a third floor addition (45.98m2) with balcony, interior alterations to the second floor, and widen detached garage at rear of newly converted 2-unt detached dwelling. See related files 12-107042-01 PLB/HVA, 12-116830 ZC and 12-128089 for CofA. final and binding
Applied May 29, 2012 · issued Oct 5, 2012 · completed Mar 2, 2017 · Permit 12 107042 BLD (revision 01)
- Closed
Small residential project · Multiple projects
Permit to construct a 2 sty rear addition, front basement walkout, interior alterations, convert basement into 2nd unit, and construct detached garage at rear. applicant revised proposal to delete the 3rd storey addition and reduce scope of 2nd storey addition to comply - see 11 299600 ZZC for zoning review
Applied Jan 17, 2012 · issued Feb 1, 2012 · completed Mar 2, 2017 · 1 home added · Permit 12 107042 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
728 Crawford St · Minor variance
To construct a new two-storey detached ancillary building to contain a garage with one parking space on the ground level and studio space (non-habitable space) on the second storey, in the rear yard, abutting the laneway.
140 m away · filed Apr 10, 2026 · Approved
778 Crawford St · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with basement, and a rear second storey balcony.
60 m away · filed Jan 16, 2026 · Approved
752 Crawford St · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard, abutting Sandra Shamas Lane.
80 m away · filed Jan 8, 2025 · Approved
828 Shaw St · Consent
To obtain consent to sever the property into three residential lots, and to create/maintain easements/rights-of-way.
70 m away · filed Nov 7, 2024 · Approved
828 Shaw St · Minor variance
To construct a new four-storey apartment building with a total of 12 residential dwelling units, on Lots 1, 2, and 3. This lot (Lot 3) will contain a fourplex with a covered front porch with stairs, a rear sunken patio, and a rear exterior staircase (which will lead to each dwelling unit). There will be a total of 4 residential dwelling units on this lot.
70 m away · filed Nov 7, 2024 · Approved
828 Shaw St · Minor variance
To construct a new four-storey apartment building with a total of 12 residential dwelling units, on Lots 1, 2, and 3. This lot (Lot 2) will contain a fourplex with a covered front porch with stairs, a rear sunken patio, and a rear exterior staircase (which will lead to each dwelling unit). There will be a total of 4 residential dwelling units on this lot.
70 m away · filed Nov 7, 2024 · Approved
828 Shaw St · Minor variance
To construct a new four-storey apartment building with a total of 12 residential dwelling units, on Lots 1, 2, and 3. This lot (Lot 1) will contain a fourplex with a covered front porch with stairs, a rear sunken patio, and a rear exterior staircase (which will lead to each dwelling unit). There will be a total of 4 residential dwelling units on this lot.
70 m away · filed Nov 7, 2024 · Approved
171 Pendrith St · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a covered front porch with stairs, a rear ground floor deck, and a rear basement walkout.
240 m away · filed May 18, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.