Toronto address · Ward 13, Toronto Centre
82 Adelaide St E
The City of Toronto has 7 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
To erect and display two wall signs and two projecting signs, all illuminated. Erected on first storey of the south and west elevations of the building .****TIM HORTON'S****
Applied Oct 3, 2019 · issued Jan 10, 2020 · completed Jun 10, 2020 · Permit 19 231606 DST
- Closed
Addition or alteration · Interior alterations
Interior alteration of an existing suite including new equipment, finishes and fixtures.
Applied Jul 29, 2019 · issued Aug 7, 2019 · completed May 12, 2021 · Permit 19 197205 BLD
- Closed
Heating and ventilation
HVAC - Interior alteration of an existing suite including new equipment, finishes and fixtures.
Applied Jul 29, 2019 · issued Aug 19, 2019 · completed Mar 17, 2020 · Permit 19 197205 HVA
- Closed
Plumbing
Plumbing - Interior alteration of an existing suite including new equipment, finishes and fixtures.
Applied Jul 29, 2019 · issued Aug 19, 2019 · completed Apr 27, 2021 · Permit 19 197205 PLB
- Closed
Designated structure · Sign building permit related
In conjunction with a multi-storey building on the premises, proposal to erect one illuminated wall sign and one illuminated projecting sign containing static copy on the first storey south elevation. The proposed wall sign is 0.91 metres vertically by 2.77 metres horizontally at a height of 3.73 metres above grade. The proposed projecting sign is 0.64 metres vertically by 0.46 metres horizontally at a height of 3.26 metres above grade.**Teddy Store**
Applied Oct 14, 2016 · issued Dec 23, 2016 · completed Mar 17, 2017 · Permit 16 237099 DST
- Inspections under way
Addition or alteration · Interior alterations
Proposal for a new step and rail leading to the patio of the existing restaurant "Starbucks".
Applied May 12, 2016 · issued May 24, 2016 · Permit 16 154838 BLD
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to existing GF commercial Unit #2. Construct new demising wall to create new Unit #3. HVAC and PLB
Applied Sep 5, 2008 · issued Nov 14, 2008 · Permit 08 200789 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
110-112 Adelaide Street East and 85 Lombard Street
65 storeys · 600 homes · Mixed use
70 m away · Site plan · Under appeal · filed Aug 4, 2022
- Under review
59 storeys · 480 homes · Mixed use
100 m away · Site plan · Under review · filed Aug 18, 2022
- Under review
63 storeys · 370 homes · Mixed use
110 m away · Rezoning · Under review · filed Nov 28, 2025
- Approved
114-120 Church Street and 59 Richmond Street East
48 storeys · 592 homes · Mixed use
120 m away · Condominium · Approved · filed Mar 4, 2025
- Under review
17-25 Toronto Street and 55-57 Adelaide Street East
80 storeys · 816 homes · Mixed use
160 m away · Site plan · Under review · filed Apr 26, 2023
- Under review
56 storeys · 394 homes · Mixed use
180 m away · Site plan · Under review · filed Aug 3, 2022
Neighbours’ Committee of Adjustment files within 250 m
89 Church St · Minor variance
To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.
80 m away · filed Nov 4, 2024 · Approved
71 King St E · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on…
220 m away · filed Aug 26, 2024 · Approved
88 Queen St E · Consent
To obtain consent to a strata severance and to create various easements/rights-of-ways within a 52-storey mixed-use redevelopment currently under construction.
230 m away · filed Jan 26, 2024 · Approved
88 Queen St E · Consent
To obtain consent to sever portions of land (a below grade strata) for the purpose of lot additions and to create various easements/rights-of-way. This application will allow for the readjustment of the lot boundaries and easements/rights-of-way (below grade) between this property and the adjacent property to the north (municipally known as 30 Mutual Street & 25 Dalhousie Street), which were originally created from one parcel and were severed under Decision Number B0015/19TEY.
230 m away · filed Oct 16, 2023 · Approved
88 Queen St E · Minor variance
To permit the increase of residential dwelling units by constructing an additional floor above the current maximum permitted building height of the 51-storey mixed-use building, currently under construction. There will be a total of 587 dwelling units provided.
230 m away · filed Apr 17, 2023 · Approved
88 Queen St E · Minor variance
To alter the redevelopment plan for a 52-storey mixed-use building, approved under Site Specific By-law 1293-2018 and 1294-2018.
230 m away · filed Aug 22, 2022 · Approved
67 Adelaide St E · Minor variance
To construct a partial fourth floor addition to the existing building for the conversion into a Municipal Shelter.
70 m away · filed May 19, 2021 · Approved
20 Lombard St · Minor variance
To alter the redevelopment plan for a 46-storey mixed-use building, previously approved under Site-Specific By-laws 132-2016 (OMB) and 133-2016 (OMB), by creating additional dwelling units, converting residential parking spaces to commercial parking spaces and converting a bicycle parking area to a bulk parcel storage room.
190 m away · filed Sep 21, 2020 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.