Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

82 Humberview Rd

The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Other

    Installation of 21 rooftop solar panels for the purpose of home power generation and net metering.

    Applied Jun 30, 2026 · issued Jul 6, 2026 · Permit 26 194235 BLD

    Permit issued
  • Small residential project · Other

    Proposal to install 21 rooftop solar panels.

    Applied Jun 22, 2026 · completed Jun 24, 2026 · Permit 26 188659 BLD

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 87 Humberview Rd · Minor variance

    To construct a new three-storey detached dwelling (more than 50% of the existing exterior walls of the dwelling will be removed) with an integral garage, a front covered porch with stairs, and a rear third storey flat roof. The existing front driveway will be maintained and unaltered.

    130 m away · filed Jun 22, 2026 · Approved

  • 29 Bridgeview Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a canopy over the existing front porch, a side (north) second floor addition over the existing ground floor integral garage, and rear additions at the ground floor and second floor. Also, to reconstruct the rear ground floor deck with stairs.

    130 m away · filed Jun 1, 2026 · Approved

  • 103 Humberview Rd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey front addition, a rear (south-east) two-storey addition, a rear (south-west) one-storey addition, a rear basement walkout, a rear first floor deck, a front covered porch with stairs, and a front integral garage.

    230 m away · filed Mar 4, 2026 · Approved

  • 39 Humbercrest Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey east side addition with a covered front porch and a walkout basement, and a complete third storey addition with a balcony and juliet balcony on the west side. Also, to construct a rear detached ancillary building (to contain a two-car garage), abutting the laneway (Humbercrest Lane).

    200 m away · filed Dec 11, 2025 · Approved

  • 64 Humberview Rd · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing complete second and third storey additions. This current application is necessitated to seek further approval for the increased height of the roof level, from the previously approved Minor Variance Decision (under File Number A0571/24TEY).

    150 m away · filed May 30, 2025 · Approved

  • 64 Humberview Rd · Minor variance

    To alter the existing one-and-one-half-storey detached dwelling by constructing a complete second and third storey addition, a canopy over the existing front porch and a front third storey balcony. The existing parking space within the integral garage will be converted into habitable space.

    150 m away · filed Jun 26, 2024 · Approved

  • 16 Bridgeview Rd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third floor addition.

    80 m away · filed May 1, 2023 · Approved

  • 57 Langmuir Cres · Minor variance

    To alter the existing two-storey detached dwelling by constructing a one-storey rear addition with a new deck and stairs.

    140 m away · filed Jan 20, 2023 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.