Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

824 St Clair Ave W

The City of Toronto has 7 building permits since 2017 (3 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Interior alterations to convert existing restaurant to retail on ground floor (80 m2) and interior alterations to basement and second floor residential unit (20 m2)and basement underpinning (24.6 linear metres)

    Applied Jan 7, 2021 · issued Jan 13, 2021 · completed Mar 16, 2021 · Permit 20 160612 PLB

    Closed
  • Addition or alteration · Multiple projects

    Rev 01: revision to remove 1 bathroom and enlarge kitchen as per bubbled drawings[interior alterations to convert existing restaurant to retail on ground floor (80 m2) and interior alterationsto basement and second floor residential unit (20 m2)and basement underpinning (24.6 linear metres)]

    Applied Oct 20, 2020 · issued Nov 12, 2020 · completed Mar 16, 2021 · Permit 20 160612 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to convert existing restaurant to retail on ground floor (80 m2) and interior alterations to basement and second floor residential unit (20 m2)and basement underpinning (24.6 linear metres)

    Applied Jul 13, 2020 · issued Sep 9, 2020 · completed Mar 16, 2021 · Permit 20 160612 HVA

    Closed
  • Addition or alteration · Multiple projects

    Interior alterations to convert existing restaurant to retail on ground floor (80 m2) and interior alterations to basement and second floor residential unit (20 m2)and basement underpinning (24.6 linear metres)

    Applied Jun 26, 2020 · issued Jul 27, 2020 · completed Mar 16, 2021 · Permit 20 160612 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to ground floor and basement for new restaurant. 30 seats.

    Applied Feb 20, 2018 · issued Apr 25, 2018 · Permit 18 109666 HVA

    Inspections under way
  • Plumbing

    Plumbing - Interior alterations to ground floor and basement for new restaurant. 30 seats.

    Applied Jan 25, 2018 · issued Apr 25, 2018 · Permit 18 109666 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Interior alterations to ground floor and basement for new restaurant. 30 seats.

    Applied Jan 25, 2018 · issued Apr 24, 2018 · Permit 18 109666 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 246 Benson Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a side (east) two-storey addition with a ground floor deck and stairs and a side (east) second storey juliet balcony.

    210 m away · filed Jul 25, 2025 · Approved

  • 81 Greensides Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing rear additions to the first and second storeys, a complete third storey addition, a front covered porch with a canopy and platform, a rear covered porch, and a rear third storey balcony. Also, to construct a new one-storey detached ancillary building (two-car garage), in the rear yard, abutting the private laneway.

    190 m away · filed Jul 22, 2025 · Approved

  • 162 Arlington Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front two-storey addition (a one-storey portion will be partially cantilevered) with a covered front porch and an integral garage, a rear two-storey addition (a one-storey portion will be partially cantilevered at the rear ground floor and the side (south) second floor) with a rear second floor deck, a rear ground floor deck with stairs, and a rear basement walkout. There will be a total of two residential dwelling units (duplex) on this lot.

    210 m away · filed Jun 10, 2024 · Approved

  • 779 St Clair Ave W · Minor variance

    To alter the existing two-storey building (restaurant) by constructing a rear ground floor outdoor patio.

    150 m away · filed Apr 20, 2023 · Approved

  • 40 Hendrick Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a two-storey rear addition, a ground floor rear addition, and a third floor side dormer addition. Also, to reconstruct the existing front porch and stairs.

    170 m away · filed Apr 11, 2023 · Approved

  • 93 Arlington Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition.

    210 m away · filed Jan 4, 2023 · Approved

  • 60 Greensides Ave · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch, front second and third storey balconies, a rear covered porch, a rear basement walkout, and rear second and third storey balconies.

    200 m away · filed Dec 6, 2022 · Approved

  • 228 Benson Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a one-storey rear addition with a rooftop balcony, a rear first level deck, and a parking space in the rear yard, abutting the laneway. The existing shed in the rear yard will be demolished.

    190 m away · filed Nov 25, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.