Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

83 Robina Ave

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Accessory Building(s)

    Revision 01 - Proposed revision to 24 117081 BLD 00 SRThe existing brick wall for Robina was so fragile that it could not be used structurally. The revised architecture drawings and engineering drawings show the walls preserved, but a new structural wall and foundation inset from the masonry now supports the roof.-------------------------------------------------------------------------------To reconstruct the roof of the existing ancillary building (detached storage garage), located in the rear yard of the property.

    Applied Jun 10, 2024 · issued Jun 13, 2024 · completed Oct 15, 2024 · Permit 24 117081 BLD (revision 01)

    Closed
  • Small residential project · Accessory Building(s)

    To reconstruct the roof of the existing ancillary building (detached storage garage), located in the rear yard of the property.

    Applied Feb 20, 2024 · issued Feb 22, 2024 · completed Oct 15, 2024 · Permit 24 117081 BLD

    Closed
  • Small residential project · Garage

    Rennovation of an Existing (100year-old) Storage Garage (No vehicular Access): New roof and openings.

    Applied Jan 12, 2024 · completed Jan 17, 2024 · Permit 24 104219 BLD

    Cancelled
  • Small residential project · Garage

    Renovation of an existing storage garage (100 years old and no vehicular access) with new roof and openings, and no changes to foorprint or foundation. Proposed use remains "storage garage">> Applicatoin cancelled for zoning non-compliance - COA variance required -see comment

    Applied Oct 15, 2023 · completed Oct 17, 2023 · Permit 23 214610 BLD

    Cancelled
  • Small residential project · Interior alterations

    Proposal to conduct interior alterations

    Applied Jul 13, 2018 · issued Jul 20, 2018 · completed Dec 5, 2018 · Permit 18 193781 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To reconstruct the roof of the existing ancillary building (detached storage garage), located in the rear yard of the property.

    Decision: Approved (hearing Dec 13, 2023)

    Filed Oct 31, 2023 · File A0953/23TEY

    Approved with conditions

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 281 Oakwood Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front one-storey addition (reconstruction of the existing enclosed porch).

    220 m away · filed Apr 29, 2026 · Approved

  • 27 Conway Ave · Minor variance

    To construct a new one-storey ancillary building (to contain one garden suite) in the rear yard. There will be a total of four residential dwelling units on this lot (three units occupying the main dwelling and one unit occupying the ancillary building).

    240 m away · filed Mar 10, 2026 · Approved

  • 77 Roseneath Gdns · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new front covered porch with stairs. This porch will cover the entire width of the front wall.

    180 m away · filed Oct 23, 2025 · Approved

  • 295 Oakwood Ave · Minor variance

    To construct a new three-storey semi-detached houseplex with a rear basement walkout with stairs, a covered front porch, and a rear exterior staircase with landings to access each storey. Also, to construct a new two-storey detached ancillary building containing a dwelling unit (garden suite). There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit in the ancillary building). Minor Variance Decision A0797/24TEY approved a new three-storey semi-detached fourplex dwelling (reviewed as an apartment building) with a total of four dwel…

    250 m away · filed Oct 2, 2025 · Approved

  • 295 Oakwood Ave · Consent

    To obtain consent to create new easements/rights-of-way (increase the easements/rights-of-way area approved for Parts 3 and 4, in Consent Decision B0058/24TEY).

    250 m away · filed Oct 2, 2025 · Approved

  • 295 Oakwood Ave · Minor variance

    To construct a new three-storey semi-detached houseplex with a rear basement walkout with stairs, a covered front porch, and a rear exterior staircase with landings to access each storey. Also, to construct a new two-storey detached ancillary building containing a dwelling unit (garden suite). There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit in the ancillary building). Minor Variance Decision A0796/24TEY approved a new three-storey semi-detached fourplex dwelling (reviewed as an apartment building) with a total of four dwel…

    250 m away · filed Oct 2, 2025 · Approved

  • 261 Winona Dr · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a covered ground level terrace.

    190 m away · filed Aug 1, 2025 · Approved

  • 295 Oakwood Ave · Minor variance

    To construct a new three-storey semi-detached dwelling (fourplex) with a rear below-grade patio and an exterior staircase to access each level. The existing ancillary building (detached garage) will be demolished.

    250 m away · filed Sep 10, 2024 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.