Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

83 Virginia Ave

The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Rev 1; HVAC - To construct a new 2 storey single family detached dwelling and integral garage with finished basement.

    Applied Apr 3, 2021 · issued Apr 9, 2021 · completed Mar 24, 2022 · Permit 19 214767 HVA (revision 01)

    Closed
  • New house · New building

    Rev 01 - changes to interior and elevationsTo construct a new 2 storey single family detached dwelling and integral garage with finished basement.

    Applied Nov 19, 2020 · issued Dec 22, 2020 · completed Mar 24, 2022 · Permit 19 214767 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - To construct a new 2 storey single family detached dwelling and integral garage with finished basement.

    Applied Aug 20, 2020 · issued Aug 26, 2020 · completed Mar 24, 2022 · Permit 19 214767 HVA

    Closed
  • Plumbing

    Plumbing - To construct a new 2 storey single family detached dwelling with finished basement.

    Applied Sep 1, 2019 · issued Oct 31, 2019 · completed Mar 24, 2022 · Permit 19 214767 PLB

    Closed
  • New house · New building

    To construct a new 2 storey single family detached dwelling and integral garage with finished basement.

    Applied Sep 1, 2019 · issued Oct 31, 2019 · completed Mar 24, 2022 · 1 home added · Permit 19 214767 BLD

    Closed
  • Demolition

    Demo existing sfd

    Applied Sep 1, 2019 · issued Nov 4, 2019 · completed Sep 22, 2021 · 1 home removed · Permit 19 214774 DEM

    Closed
  • Drains and site services

    Drain - To construct a new 2 storey single family detached dwelling with finished basement.

    Applied Sep 1, 2019 · issued Oct 31, 2019 · completed Mar 24, 2022 · Permit 19 214767 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new two-storey detached dwelling.

    Decision: Approved (hearing Oct 24, 2018)

    Filed May 25, 2018 · File A0527/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 111 Virginia Ave · Minor variance

    To construct a new two-storey semi-detached dwelling with a front integral garage, a front covered porch with stairs, a rear second storey deck with stairs, and a rear basement walkout. There will be a total of one residential dwelling unit on this lot.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 109 Virginia Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 111 Virginia Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 111 Virginia Ave · Minor variance

    To construct a new two-storey semi-detached dwelling with a front integral garage, a front covered porch with stairs, a rear second storey deck with stairs, and a rear basement walkout. There will be a total of one residential dwelling unit on this lot.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 109 Virginia Ave · Minor variance

    To construct a new two-storey semi-detached dwelling with a front integral garage, a front covered porch with stairs, a rear second storey deck with stairs, and a rear basement walkout. There will be a total of one residential dwelling unit on this lot.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 109 Virginia Ave · Minor variance

    To construct a new two-storey semi-detached dwelling with a front integral garage, a front covered porch with stairs, a rear second storey deck with stairs, and a rear basement walkout. There will be a total of one residential dwelling unit on this lot.

    140 m away · filed Feb 11, 2026 · Hearing scheduled

  • 226 Glebemount Ave · Minor variance

    To alter the existing two-storey detached dwelling (basement level is considered the first level) by constructing a two-storey addition along the south side wall and rear wall (including a basement extension), a complete third storey addition (with dormers), a front integral garage, a covered front porch with stairs, a rear first floor balcony, and a rear walkout basement. The existing rear one-storey ancillary building (detached garage) will be demolished.

    210 m away · filed Jan 21, 2026 · Approved

  • 122 Holborne Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a new front one-storey addition (enclosing the existing front porch).

    210 m away · filed Nov 18, 2025 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.