Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

836-842 Pape Ave

The City of Toronto has 7 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    REV 01: Additional washrooms and plumbing fixtures added to the scope to match architectural set.Plumbing - Proposed interior alterations of existing commercial ground floor to be a Tzatziki greek restaurant with liquor (main floor) Bakery cafe , Baking pies making sandwiches various coffees light bar (rear of building).

    Applied Sep 10, 2026 · issued Sep 17, 2026 · Permit 26 125496 PLB (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Proposed interior alterations of existing commercial ground floor to be a Tzatziki greek restaurant with liquor (main floor) Bakery cafe , Baking pies making sandwiches various coffees light bar (rear of building).

    Applied Mar 5, 2026 · issued Jun 11, 2026 · Permit 26 125496 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations of existing commercial ground floor to be a Tzatziki greek restaurant with liquor (main floor) Bakery cafe , Baking pies making sandwiches various coffees light bar (rear of building).

    Applied Mar 5, 2026 · Permit 26 125496 HVA

    Issuance pending
  • Addition or alteration · Multiple projects

    Proposed interior alterations of former office to be a Tzatziki greek restaurant with liquor (main floor) Bakery cafe , Baking pies making sandwiches various coffees light bar (rear of building).

    Applied Mar 5, 2026 · issued Jun 11, 2026 · Permit 26 125496 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    Revision 02: Removal of the kitchen from the smaller room on the second floor, resulting in the second floor having only one unit. Revision of the fire-rating plan accordingly.Proposal to construct repairs to fire damaged building.

    Applied Jan 8, 2026 · issued Jan 9, 2026 · Permit 25 197962 BLD (revision 02)

    Revision issued
  • Addition or alteration · Interior alterations

    Rev 01: Life Safety - Fire separations - Floors Between Group C and D OccupanciesProposal to construct repairs to fire damaged building.

    Applied Nov 27, 2025 · issued Dec 3, 2025 · Permit 25 197962 BLD (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Proposal to construct repairs to fire damaged building.

    Applied Jul 22, 2025 · issued Jul 23, 2025 · Permit 25 197962 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 654-668 Danforth Avenue

    49 storeys · 496 homes · Mixed use

    500 m away · Site plan · Under review · filed Aug 3, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 28 East York Ave · Minor variance

    To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).

    220 m away · filed Sep 2, 2026 · Hearing scheduled

  • 108 Eaton Ave · Minor variance

    Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.

    200 m away · filed Jun 2, 2026 · Accepted

  • 224 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by enclosing a portion of the front porch (for habitable space), a front third floor dormer expansion, a rear basement window well, a rear cantilevered second floor addition, and a rear third floor dormer addition with a rooftop deck (above the existing rear addition). The existing rear one-storey addition will be demolished.

    160 m away · filed Mar 12, 2026 · Approved

  • 49 Muriel Ave · Minor variance

    To construct a new front yard parking pad, abutting Muriel Avenue.

    200 m away · filed Oct 10, 2025 · Refused

  • 234 Browning Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (solarium). Also, to construct a one-storey ancillary building (detached garage), in the front yard.

    40 m away · filed Jul 24, 2024 · Approved

  • 196 Fulton Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage with an undersized parking space) in the rear yard of the existing two-storey semi-detached dwelling. The existing detached garage, shed, and a portion of the rear ground floor deck will be demolished.

    240 m away · filed May 30, 2024 · Approved

  • 114 Eaton Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a side (south) two-storey addition, an integral garage, a front porch with stairs, a rear ground floor deck with stairs, a front second storey balcony, and a rear basement walkout. Also, to construct interior alterations to convert the dwelling into a duplex. There will be two residential dwelling units within this altered dwelling.

    190 m away · filed May 17, 2024 · Approved

  • 46 Sammon Ave · Minor variance

    To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front porch), a rear two-storey addition, and a rear ground floor covered deck with stairs. The existing rear ground floor landing and stairs will be demolished.

    230 m away · filed May 2, 2024 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.