Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

84 Haverson Blvd

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for interior alterations to convert basement to a secondary suite.

    Applied Oct 29, 2019 · issued Feb 3, 2020 · completed Jul 6, 2020 · Permit 19 242460 PLB

    Closed
  • Small residential project · Second suite (New)

    Proposal for interior alterations to convert basement to a secondary suite.

    Applied Oct 29, 2019 · issued Feb 3, 2020 · completed Jul 21, 2020 · 1 home added · Permit 19 242460 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 33 Venn Cres · Minor variance

    To construct a new semi-detached fourplex.

    230 m away · filed Mar 3, 2026 · Deferred

  • 33 Venn Cres · Minor variance

    To construct a new detached fourplex.

    230 m away · filed Mar 3, 2026 · Deferred

  • 33 Venn Cres · Consent

    To obtain consent to sever the lot into three residential lots, one of which is undersized.

    230 m away · filed Mar 3, 2026 · Deferred

  • 33 Venn Cres · Minor variance

    To construct a new semi-detached fourplex.

    230 m away · filed Mar 3, 2026 · Deferred

  • 3 Venn Cres · Minor variance

    To construct an ancillary structure in the rear yard which will have a detached garage and a garden suite.

    230 m away · filed Oct 11, 2023 · Approved

  • 68 Haverson Blvd · Minor variance

    To legalize and to maintain the new dwelling with a detached garage in the rear yard that is currently under construction. A previous Committee of Adjustment application (A0483/20EYK) approved a second storey addition above the existing dwelling, a two-storey rear addition and a rear detached garage with variances related to floor space index, length, depth, lot coverage of an ancillary structure and side yard setback of an ancillary structure.

    90 m away · filed Jun 9, 2023 · Approved

  • 70 Haverson Blvd · Minor variance

    To construct a new dwelling.

    60 m away · filed Jan 27, 2023 · Approved

  • 68 Haverson Blvd · Minor variance

    To legalize and to maintain the new dwelling with a detached rear garage that is currently under construction. A previous Committee of Adjustment application (A0483/20EYK) approved a second storey addition above the existing dwelling, a two-storey rear addition and a rear detached garage with variances related to floor space index, length, depth, lot coverage of an ancillary structure and side yard setback of an ancillary structure.

    90 m away · filed Apr 27, 2022 · Refused

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.