Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

84 Hubbard Blvd

The City of Toronto has 10 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Porch

    Reconstruct and enlarge the ground floor front deck and replace the existing masonry support piers. Replace second floor porch roof posts and guard.

    Applied Jun 25, 2026 · issued Jul 2, 2026 · Permit 26 191363 BLD

    Inspections under way
  • Heating and ventilation

    Revision 01 - Mechanical changes to suit site conditionsHVAC - Change of use from duplex to sfd. Interior alterations to basement, ground, second & third floors. Third floor rear addition.

    Applied May 30, 2024 · issued Jun 6, 2024 · Permit 22 212345 HVA (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    Revision 01. Changes according to site conditionChange of use from duplex to sfd. Interior alterations to basement, ground, second & third floors. Third floor rear addition.

    Applied Feb 17, 2023 · issued Mar 21, 2023 · Permit 22 212345 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - Change of use from duplex to sfd. Interior alterations to basement, ground, second & third floors. Third floor rear addition.

    Applied Oct 3, 2022 · issued Jan 6, 2023 · completed Aug 23, 2024 · Permit 22 212345 PLB

    Closed
  • Heating and ventilation

    HVAC - Change of use from duplex to sfd. Interior alterations to basement, ground, second & third floors. Third floor rear addition.

    Applied Oct 3, 2022 · issued Jan 6, 2023 · Permit 22 212345 HVA

    Inspections under way
  • Drains and site services

    Drain - Change of use from duplex to sfd. Interior alterations to basement, ground, second & third floors. Third floor rear addition.

    Applied Oct 3, 2022 · issued Jan 6, 2023 · completed Jul 25, 2024 · Permit 22 212345 DRN

    Closed
  • Small residential project · Multiple projects

    Change of use from duplex to sfd. Interior alterations to basement, ground, second & third floors. Third floor rear addition.

    Applied Oct 3, 2022 · issued Jan 6, 2023 · 1 home removed · Permit 22 212345 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposal to underpin the foundation of an existing semi dwelling with 2 units.Note : Partywall previously underpinned as a partywall permit with neighboring dwelling.

    Applied Aug 26, 2022 · issued Sep 2, 2022 · completed Mar 3, 2026 · Permit 22 196380 DRN

    Closed
  • Plumbing

    Plumbing - Proposal to underpin the foundation of an existing semi dwelling with 2 units.Note : Partywall previously underpinned as a partywall permit with neighboring dwelling.

    Applied Aug 26, 2022 · issued Sep 2, 2022 · completed Mar 3, 2026 · Permit 22 196380 PLB

    Closed
  • Small residential project · Underpinning

    Proposal to underpin the foundation of an existing semi dwelling with 2 units.Note : Partywall previously underpinned as a partywall permit with neighboring dwelling.

    Applied Aug 26, 2022 · issued Sep 2, 2022 · completed Aug 28, 2023 · Permit 22 196380 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New NR building

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing an extension to the front covered porch with stairs. Also, to construct a new one-storey ancillary building (shed with a green roof) in the rear yard of the property.

    Decision: Approved (hearing May 28, 2025)

    Filed Mar 27, 2025 · File A0220/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 25 Selwood Ave · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage), in the rear yard.

    40 m away · filed Sep 1, 2026 · Postponed

  • 34 Balsam Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear second storey addition (above a portion of the existing rear ground floor) with a new roof (for the remaining portion of the existing rear ground floor), and a new rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.

    190 m away · filed Aug 25, 2025 · Approved

  • 29 Maclean Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front third storey addition (for habitable space).

    90 m away · filed Jul 30, 2025 · Approved

  • 34 Fernwood Park Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing an integral garage, a partial third storey addition, a rear basement walkout, and a rear first level deck. The front porch will be reconstructed with a canopy and stairs. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).

    230 m away · filed Jul 28, 2025 · Approved

  • 32 Fernwood Park Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a partial third storey addition, a rear first level deck, and rear and side (south) basement walkouts. The front porch will be reconstructed with a canopy and stairs. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units (duplex) on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).

    240 m away · filed Jul 28, 2025 · Approved

  • 32 Fernwood Park Ave · Minor variance

    To alter the existing three-storey semi-detached duplex dwelling (basement level is considered the first storey) by constructing a partial fourth storey addition, a rear second level deck, a raised front porch with stairs and canopy (to replace the lawfully existing front porch), and front and rear basement walkouts. One parking space will be located in the rear yard, which will be accessed from a shared mutual right-of-way between 30 and 32 Fernwood Park Avenue. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the…

    240 m away · filed Jun 2, 2025 · Refused

  • 34 Fernwood Park Ave · Minor variance

    To alter the existing three-storey semi-detached duplex dwelling (basement level is considered the first storey) by constructing an integral garage, a partial fourth storey addition, a rear second level deck, a raised front porch with stairs and canopy, and front and rear basement walkouts. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit occupying the second, third, and fourth levels).

    230 m away · filed Jun 2, 2025 · Refused

  • 52 Scarboro Beach Blvd · Minor variance

    To maintain the existing two-storey semi-detached dwelling (containing two residential dwelling units), with a front porch, and a front second storey balcony. Also, to maintain the rear one-storey ancillary building (three-car garage).

    190 m away · filed Jan 23, 2025 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.