Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

84 Mortimer Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed underpinning (28.35m) and interior alterations (28.18m²) to existing single family dwelling. Party wall admin permit (24 165 154 BLD 00 SR)

    Applied Jul 26, 2024 · issued Aug 7, 2024 · completed Jan 22, 2025 · Permit 24 165112 HVA

    Closed
  • Plumbing

    Plumbing - Proposed underpinning (28.35m) and interior alterations (28.18m²) to existing single family dwelling.

    Applied Jun 14, 2024 · issued Jul 23, 2024 · completed Jan 22, 2025 · Permit 24 165112 PLB

    Closed
  • Small residential project · Underpinning

    Proposed underpinning (28.35m) and interior alterations (28.18m²) to existing single family dwelling. Party wall admin permit (24 165 154 BLD 00 SR)

    Applied Jun 14, 2024 · issued Jun 19, 2024 · completed Jun 5, 2025 · Permit 24 165112 BLD

    Closed
  • Drains and site services

    Drain - Proposed underpinning (28.35m) and interior alterations (28.18m²) to existing single family dwelling.

    Applied Jun 14, 2024 · issued Jul 25, 2024 · completed Jan 22, 2025 · Permit 24 165112 DRN

    Closed
  • Small residential project · Party wall admin permits

    Party wall admin permit in conjunction with 19-116517 at 82 Mortimer Ave.

    Applied Mar 5, 2019 · issued Mar 8, 2019 · completed Jul 21, 2022 · Permit 19 122024 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 120 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.

    200 m away · filed Jul 29, 2026 · Hearing scheduled

  • 90 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.

    240 m away · filed Jun 24, 2025 · Approved

  • 80 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.

    130 m away · filed Aug 1, 2024 · Approved

  • 78 Westwood Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished, and the existing shed in the rear yard will be maintained and unaltered.

    100 m away · filed Jun 17, 2024 · Approved

  • 94 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.

    230 m away · filed Apr 3, 2024 · Approved

  • 51 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front planter and a rear terrace.

    170 m away · filed Apr 3, 2023 · Approved

  • 92 Mortimer Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a second storey balcony above, a rear ground floor deck, and to enclose the existing covered porch.

    20 m away · filed Mar 15, 2022 · Approved

  • 168 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by: constructing a third storey addition with a rear deck; installing a secondary suite within the basement; and rebuilding the rear ground floor deck. Also, to construct an ancillary structure (shed) in the rear yard of the property.

    240 m away · filed Jan 12, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.