Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

84 South Edgely Ave

The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Garage

    Proposed detached rear garage

    Applied Jul 22, 2020 · issued Nov 6, 2020 · completed Jan 8, 2021 · Permit 20 170872 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a new detached garage in the rear of the property.

    Decision: Approved (hearing Oct 14, 2020)

    Filed Aug 20, 2020 · File A0196/20SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 58 South Woodrow Blvd · Minor variance

    To permit a parking space in the front yard.

    200 m away · filed May 13, 2024 · Approved

  • 17 South Edgely Ave · Consent

    To sever the property into two residential lots. This item was previously deferred at the May 1, 2024 hearing. Cross-Reference Minor Variance Applications: A0248/23SC and A0242/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.

    220 m away · filed Oct 27, 2023 · Approved

  • 17 South Edgely Ave · Minor variance

    To demolish the existing dwelling and to construct a new 2-storey dwelling. This item was previously deferred at the May 1, 2024 hearing. Cross-Reference Consent Application B0043/23SC and Minor Variance Application A0248/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.

    220 m away · filed Oct 27, 2023 · Approved

  • 17 South Edgely Ave · Minor variance

    To demolish the existing dwelling and to construct a new 2-storey dwelling. This item was previously deferred at the May 1, 2024 hearing. Cross-Reference Consent Application B0043/23SC and Minor Variance Application A0242/23SC. NOTE: The consent application and the minor variance applications will be jointly considered by the Committee of Adjustment.

    220 m away · filed Oct 27, 2023 · Approved

  • 32 Aylesworth Ave · Minor variance

    To construct a new detached two storey dwelling. Cross reference consent and minor variance application A0168/23SC and B0029/23SC. These applications were previously deferred at the October 18, 2023 hearing. This application was re-scheduled from the December 4, 2024 hearing.

    230 m away · filed Jul 21, 2023 · Approved

  • 32 Aylesworth Ave · Consent

    Consent to sever the existing lot into 2 parcels. Cross reference minor variance applications A0168/23SC and A0169/23SC. These applications were previously deferred at the October 18, 2023 hearing. This application was re-scheduled from the December 4, 2024 hearing.

    230 m away · filed Jul 17, 2023 · Approved

  • 32 Aylesworth Ave · Minor variance

    To construct a new detached two storey dwelling. Cross reference consent and minor variance application A0169/23SC and B0029/23SC. These applications were previously deferred at the October 18, 2023 hearing. This application was re-scheduled from the December 4, 2024 hearing.

    230 m away · filed Jul 17, 2023 · Approved

  • 100 Lillington Ave · Minor variance

    To construct a new two-storey detached dwelling.

    100 m away · filed Dec 1, 2022 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.