Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

84 Winchester St

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Party wall admin permits

    Administrative permit as part of proposed work to the party wall at 86 Winchester St - bearing beams [see 22 160458 BLD 00 SR]

    Applied Jun 10, 2022 · issued Jun 22, 2022 · completed Apr 11, 2023 · Permit 22 160446 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to renovate existing kitchen on ground floor and washroom on third floor of existing semi-detached single family dwelling.

    Applied Oct 1, 2013 · issued Oct 2, 2013 · completed Jan 13, 2026 · Permit 13 244039 PLB

    Closed
  • Small residential project · Interior alterations

    Proposal to renovate existing kitchen on ground floor and washroom on third floor of existing semi-detached single family dwelling.

    Applied Oct 1, 2013 · issued Oct 2, 2013 · completed Jan 13, 2026 · Permit 13 244039 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 26 Sackville Pl · Minor variance

    240 m away · filed Sep 25, 2026 · Accepted

  • 21 Metcalfe St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.

    120 m away · filed Mar 11, 2026 · Approved

  • 32 Salisbury Ave · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).

    140 m away · filed Jun 11, 2025 · Approved

  • 603 1/2 Parliament St · Minor variance

    To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.

    250 m away · filed Jul 18, 2024 · Approved

  • 49 Salisbury Ave · Minor variance

    To alter the existing two-and-one-half storey semi-detached dwelling by constructing a west side one-storey addition with new basement area below, and a west side three-storey elevator addition. Also the existing west side deck will be demolished. This site has heritage designation.

    180 m away · filed May 13, 2024 · Approved

  • 17 Metcalfe St · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition above the existing rear two-storey portion of the dwelling.

    130 m away · filed Apr 22, 2024 · Approved

  • 49 Metcalfe St · Minor variance

    To alter the existing three-storey semi-detached dwelling by demolishing the existing front covered porch, constructing a new covered front porch with stairs and relocating the air conditioner unit from the front of the lot (encroaching beyond the front yard lot line) to the front corner of the lot (partially encroaching beyond the front yard lot line), as approved by Minor Variance Decision A1380/22TEY. This current application is necessitated to correctly identify variances that were not included in the previous Minor Variance Decision.

    20 m away · filed Dec 28, 2023 · Approved

  • 51 Metcalfe St · Minor variance

    To alter the existing three-storey semi-detached dwelling by constructing a new front porch (to replace the existing front porch).

    30 m away · filed Dec 6, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.