Toronto address · Ward 13, Toronto Centre
85 Bleecker St
The City of Toronto has 5 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Other
Exterior Wall Repair and Local Window and Door Replacement
Applied Jan 13, 2026 · issued Feb 17, 2026 · completed Jul 31, 2026 · Permit 26 104082 BLD
- Closed
Addition or alteration · Other
.Wall and window restoration.
Applied Mar 3, 2025 · issued Apr 2, 2025 · completed Jul 2, 2025 · Permit 25 124059 BLD
- Closed
Addition or alteration · Other
Wall and window restoration
Applied Jul 16, 2024 · issued Aug 14, 2024 · completed Jul 2, 2025 · Permit 24 181373 BLD
- Inspections under way
Addition or alteration · Garage Repair/Reconstruction
Proposal to remove and replace the waterproofing on the parking garage roof slab including concrete repairs if necessary.
Applied Aug 17, 2021 · issued Sep 20, 2021 · Permit 21 199864 BLD
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Proposal to install a 4" backflow preventer
Applied Apr 13, 2015 · issued Apr 22, 2015 · Permit 15 140041 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Submitted
- Under appeal
39 storeys · 378 homes · Residential
130 m away · Site plan · Under appeal · filed Jul 6, 2023
- Under review
39 storeys · 456 homes · Mixed use
150 m away · Condominium · Under review · filed Nov 8, 2021
- Under appeal
10 storeys · 60 homes · Mixed use
360 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Under review
10 storeys · 60 homes · Mixed use
440 m away · Site plan · Under review · filed Jul 4, 2025
- Under review
107 homes · Residential
440 m away · Condominium · Under review · filed Oct 27, 2021
Neighbours’ Committee of Adjustment files within 250 m
183 Carlton St · Minor variance
To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).
220 m away · filed Apr 10, 2026 · Approved
169 Carlton St · Minor variance
To construct a one-storey ancillary structure (carport), in the rear yard, abutting the laneway (Doctor O Lane), for two parking spaces.
210 m away · filed Oct 10, 2024 · Approved
20 Aberdeen Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.
200 m away · filed Sep 4, 2024 · Approved
194 Carlton St · Minor variance
To convert the existing two-and-one-half-storey semi-detached mixed-use building into a three-unit dwelling (triplex).
180 m away · filed Jul 5, 2024 · Approved
7 Rose Ave · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
250 m away · filed May 19, 2022 · Approved
50 Bleecker St · Minor variance
To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.
90 m away · filed Jun 24, 2021 · Refused
96 Bleecker St · Minor variance
To alter the existing 2½-storey townhouse by constructing a rear third storey addition with a balcony.
50 m away · filed Jan 4, 2019 · Approved
505 Ontario St · Minor variance
To alter the existing 2½-storey townhouse by constructing a rear second and third storey addition and a rear third storey deck.
140 m away · filed Jul 26, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.