Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 6, York Centre

85 Charleswood Dr

The City of Toronto has 4 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - To construct 2 storey rear and side addition, interior alterations, front porch, proposed 1 car garage side addition, rear deck and below grade entrance.

    Applied Oct 6, 2025 · issued Oct 21, 2025 · Permit 25 195034 HVA

    Permit issued
  • Small residential project · Multiple projects

    To construct 2 storey rear and side addition, interior alterations, front porch, proposed 1 car garage side addition, rear deck and below grade entrance.

    Applied Jul 16, 2025 · issued Aug 8, 2025 · Permit 25 195034 BLD

    Inspections under way
  • Plumbing

    Plumbing - To construct 2 storey rear and side addition, interior alterations, front porch, proposed 1 car garage side addition, rear deck and below grade entrance.

    Applied Jul 16, 2025 · issued Aug 8, 2025 · Permit 25 195034 PLB

    Inspections under way
  • Drains and site services · Back water valve (Sewer only)

    Applied Sep 22, 2020 · issued Sep 23, 2020 · completed Sep 24, 2020 · Permit 20 197361 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To Propose Two Storey Rear and Side Addition and Interior Alteration.

    Decision: Approved (hearing May 29, 2025)

    Filed Apr 3, 2025 · File A0166/25NY

    Closed

What’s planned nearby

Development sites within 500 m

  • 379-381 Wilson Avenue

    13 storeys · 261 homes · Mixed use

    190 m away · Site plan · Under review · filed Dec 21, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 37 King High Ave · Minor variance

    To alter the existing detached dwelling by constructing a new front porch, a rear two-storey addition and a second storey addition with a rear terrace.

    230 m away · filed May 8, 2026 · Approved

  • 64 Charleswood Dr · Minor variance

    To construct a carport and front porch canopy.

    140 m away · filed Jul 7, 2025 · Approved

  • 98 Charleswood Dr · Minor variance

    To construct a new 2 storey dwelling with a rear deck.

    90 m away · filed Jan 21, 2025 · Approved

  • 352 Wilson Ave · Consent

    To obtain consent for the technical severance of the property for the purpose of reestablishing the two lots which merged on title.

    180 m away · filed Dec 6, 2024 · Approved

  • 433 Wilson Ave · Minor variance

    To alter the existing dwelling by converting the existing garage into habitable space (a studio apartment).

    120 m away · filed Jul 18, 2024 · Approved

  • 22 King High Ave · Minor variance

    Proposal to construct a new dwelling.

    230 m away · filed Apr 9, 2024 · Approved

  • 95 Allingham Gdns · Minor variance

    To construct a 1 storey rear addition, a 2nd floor addition and a new deck at the rear of the dwelling.

    90 m away · filed Mar 25, 2024 · Approved

  • 15 Graymar Ave · Minor variance

    Proposal to construct new two storey dwelling with a covered porch, rear deck and rear walk-up.

    210 m away · filed Oct 4, 2023 · Approved

Everything planned in York Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.