Toronto address · Ward 5, York South-Weston
85 Emmett Ave
The City of Toronto has 8 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Addition or alteration · Garage Repair/Reconstruction
Proposal for garage repairs
Applied May 29, 2025 · issued Jun 30, 2025 · Permit 25 167256 BLD
- Closed
Addition or alteration · Balcony/Guard repairs
Balcony Restoration and Roof concrete RepairsTotal number of Balcony Units: 276Total Lin.m of railings need to be replaced: 925 Lin.m.
Applied Sep 13, 2022 · issued Oct 25, 2022 · completed Aug 9, 2024 · Permit 22 202765 BLD
- Inspections under way
Plumbing · Fixtures/Roof Drains: other
Proposal to replace the exising domestic hot water tank of the portion of the domestic hot water system that serves the lower portion of the facility.
Applied Mar 2, 2020 · issued Apr 14, 2020 · Permit 20 120966 PSA
- Permit issued
Addition or alteration · Garage Repair/Reconstruction
Proposed localized conrete repair and waterproofing to the mechanical penthouse for the existing apartment building.
Applied Jan 10, 2020 · issued Feb 18, 2020 · Permit 20 103264 BLD
- Closed
Addition or alteration · Garage Repair/Reconstruction
Proposal for parking garage repairs.
Applied Jul 23, 2015 · issued Aug 25, 2015 · completed Feb 23, 2018 · Permit 15 196035 BLD
- Inspections under way
Addition or alteration · Other
Proposed construction of a detached accessory garbage enclosure(46.8m2) for existing residential condominium.
Applied Jun 5, 2014 · issued Mar 23, 2017 · Permit 14 168902 BLD
- Inspections under way
Addition or alteration · Garage Repair/Reconstruction
Slab repair and waterproofing to existing underground garage at (2) levels. Some roof repairs at grade. (top deck)
Applied Apr 3, 2012 · issued May 25, 2012 · Permit 12 148091 BLD
- Revocation pending
Plumbing · Backflow prevention devices (Water only)
Install proposed premise isolation backflow prevention device in existing apartment building.
Applied Feb 3, 2010 · issued Mar 5, 2010 · Permit 10 113569 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
Neighbours’ Committee of Adjustment files within 250 m
19 Verona Ave · Minor variance
To construct a new detached dwelling with an attached garage.
240 m away · filed Sep 26, 2021 · Approved
23 Verona Ave · Minor variance
To construct a new detached dwelling with an attached garage.
230 m away · filed Sep 26, 2021 · Approved
25 Verona Ave · Minor variance
To construct a new detached dwelling with an attached garage.
210 m away · filed Sep 26, 2021 · Approved
21 Verona Ave · Minor variance
To construct a new detached dwelling with an attached garage.
230 m away · filed Sep 26, 2021 · Approved
100 Emmett Ave · Minor variance
To alter a one-storey ancillary structure (portable) by combining two new portables to the existing single portable (fronting onto Emmett Avenue).
180 m away · filed Sep 26, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.