Toronto address · Ward 9, Davenport
885 Dovercourt Rd
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation · Heat/Ventilation: SFD/Semi/TH
propose to construct new HVAC system
Applied Apr 4, 2023 · issued Apr 18, 2023 · completed Feb 2, 2024 · Permit 23 130837 MSA
- Closed
Plumbing
Plumbing - Alteration to existing 2 storey single family dwelling . New bathroom at first floor.underpinning at basement .new secondary suite with walkout at basement.
Applied Aug 10, 2022 · issued Sep 27, 2022 · completed Feb 2, 2024 · Permit 22 188519 PLB
- Closed
Small residential project · Multiple projects
Alteration to existing 2 storey single family dwelling . New bathroom at first floor.underpinning at basement .new secondary suite with walkout at basement. Refer to related party wall admin permit.
Applied Aug 10, 2022 · issued Sep 27, 2022 · completed Feb 5, 2024 · 1 home added · Permit 22 188519 BLD
- Closed
Drains and site services
Drain - Alteration to existing 2 storey single family dwelling . New bathroom at first floor.underpinning at basement .new secondary suite with walkout at basement.
Applied Aug 10, 2022 · issued Sep 27, 2022 · completed Feb 2, 2024 · Permit 22 188519 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
Neighbours’ Committee of Adjustment files within 250 m
800 Dovercourt Rd · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.
200 m away · filed Jul 13, 2026 · Hearing scheduled
91 Salem Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a new front one-storey addition with stairs, a front basement walkout, and a rear one-storey addition with a wood landing. The existing rear ground floor deck will be maintained and unaltered.
230 m away · filed Oct 23, 2025 · Approved
238 Delaware Ave · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard of the property, abutting the private laneway.
240 m away · filed May 13, 2025 · Approved
975 Dovercourt Rd · Minor variance
To convert the existing two-storey mixed-use building into a residential building (fourplex) by constructing a rear two-storey addition with a ground floor deck and stairs, and second and third storey balconies. Also, to construct a complete third storey addition. In addition, to construct a two-storey ancillary building to contain one garden suite. There will be a total of five residential dwelling units on this lot (four dwelling units within the main house and one dwelling unit within the ancillary building).
230 m away · filed Jan 20, 2025 · Deferred
431 Concord Ave · Minor variance
To alter the existing one-storey ancillary building (detached garage abutting the laneway) by constructing a second storey addition (to contain one laneway suite that will occupy both levels). There will be a total of four residential dwelling units on this lot (three units within the main dwelling and one unit within the ancillary building).
200 m away · filed Sep 20, 2024 · Refused
301 Delaware Ave · Minor variance
To permit the existing rear third storey addition, which was constructed without an authorized building permit.
110 m away · filed May 2, 2024 · Approved
386 Concord Ave · Minor variance
To construct a new two-storey laneway suite.
170 m away · filed Jan 26, 2024 · Approved
373 Concord Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear ground floor deck. The rear two-storey addition will replace the existing rear one-storey addition and the rear second storey addition will be cantilevered on the south side of the altered dwelling.
240 m away · filed Jan 23, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.