Toronto address · Ward 14, Toronto-Danforth
887 Pape Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Party wall admin permit related to permit # 22 222284 BLD 00 SR for address 885 Pape Ave
Applied Oct 26, 2022 · issued Dec 16, 2022 · completed Apr 9, 2026 · Permit 22 222294 BLD
- Closed
Small residential project · Party wall admin permits
party wall admin permit for 885 Pape Ave
Applied Aug 24, 2021 · issued Aug 31, 2021 · completed Apr 9, 2026 · Permit 21 203604 BLD
- Closed
Small residential project · Party wall admin permits
Admin partywall permit in conjunction with 21 167057 BLD, 885 Pape Ave.
Applied Jun 7, 2021 · issued Jun 11, 2021 · completed Apr 9, 2026 · Permit 21 167069 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
28 East York Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).
170 m away · filed Sep 2, 2026 · Hearing scheduled
108 Eaton Ave · Minor variance
Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.
230 m away · filed Jun 2, 2026 · Accepted
224 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by enclosing a portion of the front porch (for habitable space), a front third floor dormer expansion, a rear basement window well, a rear cantilevered second floor addition, and a rear third floor dormer addition with a rooftop deck (above the existing rear addition). The existing rear one-storey addition will be demolished.
180 m away · filed Mar 12, 2026 · Approved
49 Muriel Ave · Minor variance
To construct a new front yard parking pad, abutting Muriel Avenue.
240 m away · filed Oct 10, 2025 · Refused
45 Kings Park Blvd · Minor variance
To alter the existing two-storey detached dwelling by constructing a front second storey addition (above the existing covered front porch).
220 m away · filed Oct 3, 2025 · Approved
234 Browning Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (solarium). Also, to construct a one-storey ancillary building (detached garage), in the front yard.
100 m away · filed Jul 24, 2024 · Approved
114 Eaton Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a side (south) two-storey addition, an integral garage, a front porch with stairs, a rear ground floor deck with stairs, a front second storey balcony, and a rear basement walkout. Also, to construct interior alterations to convert the dwelling into a duplex. There will be two residential dwelling units within this altered dwelling.
210 m away · filed May 17, 2024 · Approved
46 Sammon Ave · Minor variance
To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front porch), a rear two-storey addition, and a rear ground floor covered deck with stairs. The existing rear ground floor landing and stairs will be demolished.
160 m away · filed May 2, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.