Toronto address · Ward 8, Eglinton-Lawrence
89 Glengarry Ave
The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct a rear ground floor addition and a new full second storey addition to an existing single family bungalow. Scope inlcudes interior renovations throughout, a new front porch, with a new rear deck and basement walkout.
Applied May 7, 2021 · issued May 20, 2021 · completed Feb 18, 2022 · Permit 20 209851 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a rear ground floor addition and a new full second storey addition to an existing single family bungalow. Scope inlcudes interior renovations throughout, a new front porch, with a new rear deck and basement walkout.
Applied Oct 22, 2020 · issued Dec 22, 2020 · completed Feb 18, 2022 · Permit 20 209851 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a rear ground floor addition and a new full second storey addition to an existing single family bungalow. Scope inlcudes interior renovations throughout, a new front porch, with a new rear deck and basement walkout.
Applied Oct 22, 2020 · issued Dec 22, 2020 · completed Mar 1, 2022 · Permit 20 209851 BLD
- Closed
Drains and site services
Drain - Proposal to construct a rear ground floor addition and a new full second storey addition to an existing single family bungalow. Scope inlcudes interior renovations throughout, a new front porch, with a new rear deck and basement walkout.
Applied Oct 22, 2020 · issued Dec 22, 2020 · completed Feb 18, 2022 · Permit 20 209851 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition with an integral garage.
Decision: Approved (hearing Jul 7, 2020)
Filed Feb 3, 2020 · File A0087/20NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
90 Douglas Ave · Minor variance
To construct a new laneway suite.
140 m away · filed Jul 2, 2025 · Refused
163 Bedford Park Ave · Minor variance
To rebuild a new front porch using the existing footprint. Construction will also include a partial enclosure of the front porch.
180 m away · filed Mar 24, 2025 · Approved
87 Chudleigh Ave · Minor variance
To replace existing rear steps with a deck
190 m away · filed Sep 14, 2024 · Approved
44 Glengarry Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear addition and deck.
170 m away · filed Sep 12, 2024 · Approved
193 Bedford Park Ave · Minor variance
To construct a new detached dwelling with a new rear carport.
230 m away · filed May 23, 2024 · Approved
168 Bedford Park Ave · Minor variance
To construct a new dwelling and laneway suite.
240 m away · filed Apr 24, 2024 · Approved
140 Chatsworth Dr · Minor variance
To alter the existing building by constructing a rear second floor deck on existing roof.
220 m away · filed Mar 21, 2024 · Approved
66 Glengarry Ave · Minor variance
To construct a new 2 storey dwelling.
90 m away · filed Feb 2, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.