Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 16, Don Valley East

895 Don Mills Rd

The City of Toronto has 60 building permits since 2017 (10 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposed interior alterations to existing office

    Applied Jun 30, 2026 · issued Aug 14, 2026 · Permit 26 194028 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to existing office

    Applied Jun 30, 2026 · issued Aug 14, 2026 · Permit 26 194028 HVA

    Inspections under way
  • Plumbing

    Plumbing - Office Interior Alteration to non-residential building - Addition of partition walls and redistribution of mechanical system to suite partitioning.

    Applied Mar 16, 2026 · issued Mar 19, 2026 · completed Jun 17, 2026 · Permit 26 130334 PLB

    Closed
  • Heating and ventilation

    HVAC - Office Interior Alteration to non-residential building - Addition of partition walls and redistribution of mechanical system to suite partitioning.

    Applied Mar 16, 2026 · issued Mar 18, 2026 · completed Jun 16, 2026 · Permit 26 130334 HVA

    Closed
  • Addition or alteration · Interior alterations

    Office Interior Alteration to non-residential building - Addition of partition walls and redistribution of mechanical system to suite partitioning.

    Applied Mar 16, 2026 · issued Mar 17, 2026 · completed Jul 15, 2026 · Permit 26 130334 BLD

    Closed
  • Heating and ventilation

    HVAC - Office interior alteration to non-residential building - Addition of partition walls and redistribution of mechanical system to suite partitioning.

    Applied Mar 5, 2026 · completed Mar 6, 2026 · Permit 26 125316 HVA

    Cancelled
  • Plumbing

    Plumbing - Office interior alteration to non-residential building - Addition of partition walls and redistribution of mechanical system to suite partitioning.

    Applied Mar 5, 2026 · completed Mar 6, 2026 · Permit 26 125316 PLB

    Cancelled
  • Addition or alteration · Interior alterations

    Office interior alteration to non-residential building - Addition of partition walls and redistribution of mechanical system to suite partitioning.

    Applied Mar 5, 2026 · completed Mar 6, 2026 · Permit 26 125316 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal for removal of existing interior finishes, partition walls, ceilings, millwork, plumbing fixtures, washrooms, electrical outlets, lighting etc and proposed alterations at second floor infill in select areas, new ground floor (ancillary) offices, new universal washroom, HVAC, plumbing, electrical and FP revisions; pre finished self storage lockers throughout.

    Applied Dec 18, 2025 · issued Jun 8, 2026 · Permit 25 266218 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for removal of existing interior finishes, partition walls, ceilings, millwork, plumbing fixtures, washrooms, electrical outlets, lighting etc and proposed alterations at second floor infill in select areas, new ground floor (ancillary) offices, new universal washroom, HVAC, plumbing, electrical and FP revisions; pre finished self storage lockers throughout.

    Applied Dec 18, 2025 · issued Jun 8, 2026 · Permit 25 266218 HVA

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposal for removal of existing interior finishes, partition walls, ceilings, millwork, plumbing fixtures, washrooms, electrical outlets, lighting etc and proposed alterations at second floor infill in select areas, new ground floor (ancillary) offices, new universal washroom, HVAC, plumbing, electrical and FP revisions; pre finished self storage lockers throughout.

    Applied Dec 15, 2025 · issued Jun 8, 2026 · Permit 25 266218 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alterations to include the addition of partition walls and redistribution of mechanical system to suite partitioning.

    Applied Oct 30, 2025 · issued Nov 3, 2025 · completed Nov 18, 2025 · Permit 25 247099 HVA

    Closed
Show 48 more permits
  • Addition or alteration · Interior alterations

    Proposed interior alterations to include the addition of partition walls and redistribution of mechanical system to suite partitioning.

    Applied Oct 30, 2025 · issued Oct 31, 2025 · completed Dec 18, 2025 · Permit 25 247099 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposed demolition of existing interior finishes, partition walls, ceiling, millworks, plumbing fixtures, washrooms, electrical outlets, lighting, etc.

    Applied Sep 12, 2025 · completed Sep 16, 2025 · Permit 25 224837 BLD

    Cancelled
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to decomission the IT room in existing office space on the ground floor

    Applied May 15, 2024 · issued May 31, 2024 · completed Sep 18, 2024 · Permit 24 148881 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to decomission the IT room in existing office space on the ground floor

    Applied May 15, 2024 · issued May 31, 2024 · completed Aug 19, 2024 · Permit 24 148881 HVA

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Installation of maglock for the elevator lobby door

    Applied Apr 6, 2023 · issued May 16, 2023 · completed Aug 30, 2023 · Permit 23 131552 FSU

    Closed
  • Heating and ventilation

    REV 01: AMENDMENT 22 211423 HVA 00 MS - as per drawingsHVAC - Proposed interior alterations

    Applied Mar 16, 2023 · issued Mar 23, 2023 · completed Aug 21, 2023 · Permit 22 211423 HVA (revision 01)

    Closed
  • Plumbing

    REV 01: AMENDMENT 22 211423 PLB 00 PB - as per drawingsPlumbing - Proposed interior alterations

    Applied Mar 16, 2023 · issued Mar 23, 2023 · completed Aug 21, 2023 · Permit 22 211423 PLB (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    REV 01: INTERIOR ALTERATION AMENDMENT 22 211423 BLD 00 BAAMENDMENT 22 211423 HVA 00 MSAMENDMENT 22 211423 PLB 00 PBProposed interior alterations

    Applied Mar 16, 2023 · issued Apr 20, 2023 · completed Aug 21, 2023 · Permit 22 211423 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Proposed interior alterations

    Applied Sep 30, 2022 · issued Dec 14, 2022 · completed Aug 21, 2023 · Permit 22 211423 BLD

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations

    Applied Sep 30, 2022 · issued Dec 14, 2022 · completed Aug 21, 2023 · Permit 22 211423 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposed interior alterations

    Applied Sep 30, 2022 · issued Dec 14, 2022 · completed Aug 21, 2023 · Permit 22 211423 HVA

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Installation of two maglock doors (issued BA permit 21-242033)

    Applied May 18, 2022 · issued Jul 20, 2022 · completed Dec 6, 2023 · Permit 22 148414 FSU

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to existing office - unit 104

    Applied Apr 24, 2022 · issued May 11, 2022 · completed Jan 6, 2023 · Permit 22 137627 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to existing office - unit 104

    Applied Apr 24, 2022 · issued May 11, 2022 · completed Jan 9, 2023 · Permit 22 137627 BLD

    Closed
  • Plumbing

    Plumbing - Interior alterations to existing office - unit 104

    Applied Apr 24, 2022 · issued May 11, 2022 · completed Jan 6, 2023 · Permit 22 137627 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposed Interior office renovation of the existing 8th floor. Current office has been brought back to base-building condition and will include minor demolition, new finishes throughout including millwork cabinetry, new furniture, Mechanical, electrical and AV infrastructure. Part of the fit out will include some landlord work including new demising walls and new exterior doors for access to exterior terraces along the north elevation (Qty, 3).

    Applied Nov 26, 2021 · issued Jan 11, 2022 · completed Jan 9, 2024 · Permit 21 242033 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed Interior office renovation of the existing 8th floor. Current office has been brought back to base-building condition and will include minor demolition, new finishes throughout including millwork cabinetry, new furniture, Mechanical, electrical and AV infrastructure. Part of the fit out will include some landlord work including new demising walls and new exterior doors for access to exterior terraces along the north elevation (Qty, 3).

    Applied Nov 26, 2021 · issued Jan 11, 2022 · completed Nov 29, 2023 · Permit 21 242033 HVA

    Closed
  • Plumbing

    Plumbing - Proposed Interior office renovation of the existing 8th floor. Current office has been brought back to base-building condition and will include minor demolition, new finishes throughout including millwork cabinetry, new furniture, Mechanical, electrical and AV infrastructure. Part of the fit out will include some landlord work including new demising walls and new exterior doors for access to exterior terraces along the north elevation (Qty, 3).

    Applied Nov 26, 2021 · issued Jan 11, 2022 · completed Nov 29, 2023 · Permit 21 242033 PLB

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations to the 4th floor of existing office "Right at Home Realty"

    Applied Oct 28, 2019 · issued Dec 6, 2019 · completed Mar 11, 2020 · Permit 19 242000 PLB

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to the 4th floor of existing office "Right at Home Realty"

    Applied Oct 28, 2019 · issued Dec 6, 2019 · completed Apr 22, 2020 · Permit 19 242000 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to the 4th floor of existing office "Right at Home Realty"

    Applied Oct 28, 2019 · issued Dec 6, 2019 · completed Mar 11, 2020 · Permit 19 242000 HVA

    Closed
  • Addition or alteration · Garage Repair/Reconstruction

    2019 PARKADE REPAIRS- Concrete repairs and replacement of waterproofing membrane and asphalt topping on top level of parkade (Level P9) and select ramps within parkade structure- Miscellaneous localized repairs to waterproofing membrane and asphalt topping within parkade structure

    Applied Jun 5, 2019 · issued Jun 28, 2019 · completed Jan 6, 2023 · Permit 19 166269 BLD

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to remove existing washroom (5m2).

    Applied Sep 13, 2017 · issued Nov 30, 2017 · completed Jun 18, 2018 · Permit 17 232145 BLD

    Closed
  • Plumbing

    Plumbing - Interior alterations to remove existing washroom (5m2)

    Applied Sep 13, 2017 · issued May 2, 2018 · completed Jun 20, 2018 · Permit 17 232145 PLB

    Closed
  • Designated structure · Sign building permit related

    To erect and display one illuminated wall sign, on the south west elevation of eighth storey. Already approved by variance # 17-118292.**REGUS**

    Applied May 15, 2017 · issued May 31, 2017 · completed Oct 17, 2017 · Permit 17 159192 DST

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to the 9th floor - single tenant (729m2)

    Applied Apr 11, 2016 · issued May 11, 2016 · completed Jan 10, 2017 · Permit 16 138664 HVA

    Closed
  • Addition or alteration · Interior alterations

    Tower 2, Suite 104, Interior Alterations on ground floor to Fana Group.

    Applied Dec 15, 2015 · issued Dec 31, 2015 · completed Apr 28, 2023 · Permit 15 265050 BLD

    Closed
  • Addition or alteration · Interior alterations

    69.To construct interior alterations (69.6m2)

    Applied Dec 23, 2014 · issued Jan 12, 2015 · completed Mar 6, 2017 · Permit 14 267076 BLD

    Closed
  • Heating and ventilation

    HVAC - To construct interior alterations (69.6m2)

    Applied Dec 23, 2014 · issued Jan 15, 2015 · completed Mar 16, 2017 · Permit 14 267076 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposed renovations to partial ground floor plan (54m2) for Morneau Shepell.

    Applied May 20, 2014 · issued Aug 7, 2014 · completed Oct 31, 2024 · Permit 14 158830 BLD

    Closed
  • Fire and security upgrade · Fire alarm

    Fire alarm control panel replacement located in basement level on Building A

    Applied Feb 25, 2014 · issued Mar 11, 2014 · completed May 21, 2024 · Permit 14 121413 FSU

    Closed
  • Fire and security upgrade · Fire alarm

    Fire alarm control panel replacement located in basement level on Building B

    Applied Feb 25, 2014 · issued Apr 8, 2014 · completed May 21, 2024 · Permit 14 121407 FSU

    Closed
  • Plumbing

    Plumbing - Tower 1, 5th Floor - Morneau Shepell

    Applied Feb 10, 2012 · issued Mar 1, 2012 · Permit 12 120934 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Tower 1, 5th Floor - Morneau Shepell

    Applied Feb 10, 2012 · issued Feb 14, 2012 · Permit 12 120934 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    7th Floor Unit 700 - Morneau Sobeco

    Applied Mar 28, 2011 · issued May 5, 2011 · completed Oct 31, 2024 · Permit 11 155884 BLD

    Closed
  • Addition or alteration · Interior alterations

    Data Centre - IBM

    Applied Jan 26, 2011 · issued Mar 9, 2011 · completed Jun 12, 2025 · Permit 11 113951 BLD

    Closed
  • Addition or alteration · Interior alterations

    Renovations to existing third floor office space.

    Applied Jun 4, 2010 · issued Jun 28, 2010 · completed Sep 10, 2024 · Permit 10 189716 BLD

    Closed
  • Addition or alteration · Interior alterations

    Graystone Group- Unit 206 tower 2

    Applied Sep 23, 2009 · issued Nov 16, 2009 · Permit 09 172061 BLD

    Inspections under way
  • Plumbing

    Plumbing - Graystone Group- Unit 206 tower 2

    Applied Sep 23, 2009 · issued Nov 16, 2009 · completed Oct 10, 2024 · Permit 09 172061 PLB

    Closed
  • Addition or alteration · Interior alterations

    Fana Group - Beacon Wealth - tower 2, unit 200

    Applied Feb 20, 2009 · issued Mar 30, 2009 · completed Sep 9, 2024 · Permit 09 110857 BLD

    Closed
  • Addition or alteration · Interior alterations

    Portion of the second floor - Unit 200 - Fana Park Centre Corp.

    Applied Oct 8, 2008 · issued Nov 6, 2008 · completed Aug 22, 2024 · Permit 08 211150 BLD

    Closed
  • Addition or alteration · Balcony/Guard repairs

    replace 3 balcony railings.

    Applied Jun 19, 2007 · issued Jun 21, 2007 · Permit 07 234307 BLD

    Inspections under way
  • Addition or alteration · Interior alterations

    3rd floor offices - MFX

    Applied Mar 2, 2007 · issued Mar 12, 2007 · completed May 2, 2024 · Permit 07 112899 BLD

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to suite 108 for orthopedic offices.

    Applied Jun 7, 2002 · issued Jun 26, 2002 · completed Oct 21, 2024 · Permit 02 143939 BLD

    Closed
  • Addition or alteration · Interior alterations

    Interior alteration to floors 4, 7, 8 and 9.

    Applied Mar 7, 2002 · issued May 28, 2002 · completed Oct 21, 2024 · Permit 02 116512 BLD

    Closed
  • Addition or alteration · Interior alterations

    Intertior altertion on the 5th floor & 6th floor for morneau sobeco toronto office

    Applied Aug 29, 2001 · issued Oct 19, 2001 · completed Sep 10, 2024 · Permit 01 162251 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Intertior altertion on the 5th floor & 6th floor for morneau sobeco toronto office

    Applied Jul 25, 2001 · issued Aug 15, 2001 · completed Sep 10, 2024 · Permit 01 162251 CMB

    Closed
  • Non-residential building permit · Alteration to existing building

    Interior a,lterations on the fourth floor of an existing building

    Applied Nov 30, 2000 · issued Dec 18, 2000 · Permit 00 358880 CMB

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Consent · Sever lot

    To obtain consent to sever the lot into two and create an easement.

    Filed Sep 22, 2025 · 2 new lots · File B0027/25NY

    Deferred

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 9 Redwing Pl · Minor variance

    To construct a two storey side addition with integral garage, one storey front addition, side entrance and stairs for garage access.

    230 m away · filed Jun 8, 2023 · Approved

Everything planned in Don Valley East

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.