Toronto address · Ward 25, Scarborough-Rouge Park
895 Milner Ave
The City of Toronto has 23 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
3 Wall Signs
Applied Feb 21, 2025 · issued Mar 4, 2025 · completed Apr 25, 2025 · Permit 25 119984 DST
- Closed
Plumbing
REV 01 - Revision to Piping drawingsPlumbing - PROPOSED: Interior Alterations/Tenant Fit-up for Tenant of 895 Milner Avenue (Breadsource Corporation)
Applied Sep 13, 2024 · issued Oct 1, 2024 · completed Jan 20, 2025 · Permit 23 234009 PLB (revision 01)
- Cancelled
Fire and security upgrade · Sprinklers
Proposal for fire Protection System as part of Interior Alterations/Tenant Fit-up
Applied Jan 22, 2024 · completed Jan 23, 2024 · Permit 24 107161 FSU
- Deficiency notice issued
Alternative solution
The proposed development at 895 Milner Avenue is a Group F, Division 2 Medium Hazard Industrial occupancy with subsidiary Group D, Business and Personal Services occupancy and Group E, Mercantile occupancy. The building is sprinkler protected throughout, but not equipped with a fire alarm system. The building is provided with multiple egress doors and exits. Whilst the prescriptive travel distance of 45 m is exceeded in the processing area, a timed-exit analysis is provided in this alternative solution report to demonstrate that occupants in the processing area will be able to exit in a timel…
Applied Dec 22, 2023 · Permit 23 238182 ALT
- Inspections under way
Addition or alteration · Interior alterations
PROPOSED: Interior Alterations/Tenant Fit-up for Tenant of 895 Milner Avenue (Breadsource Corporation)
Applied Dec 8, 2023 · issued Jan 29, 2024 · Permit 23 234009 BLD
- Closed
Plumbing
Plumbing - PROPOSED: Interior Alterations/Tenant Fit-up for Tenant of 895 Milner Avenue (Breadsource Corporation)
Applied Dec 8, 2023 · issued Jan 29, 2024 · completed Jan 20, 2025 · Permit 23 234009 PLB
- Closed
Heating and ventilation
HVAC - PROPOSED: Interior Alterations/Tenant Fit-up for Tenant of 895 Milner Avenue (Breadsource Corporation)
Applied Dec 8, 2023 · issued Jan 29, 2024 · completed Jan 23, 2025 · Permit 23 234009 HVA
- Closed
Drains and site services
REV01: Proposed revision to include tenant production sanitary requirements.Drain - Proposed construction of new 1-storey industrial building (9503m2)
Applied Oct 6, 2023 · issued Oct 18, 2023 · completed Jan 16, 2025 · Permit 22 241433 DRN (revision 01)
- Closed
Plumbing
Plumbing - Interior alterations for tenant fit-up
Applied Sep 28, 2023 · issued Nov 7, 2023 · completed Jan 16, 2025 · Permit 23 208426 PLB
- Closed
Heating and ventilation
HVAC - Interior alterations for tenant fit-up
Applied Sep 28, 2023 · issued Nov 7, 2023 · completed Oct 16, 2024 · Permit 23 208426 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations for tenant fit-up
Applied Sep 28, 2023 · issued Nov 7, 2023 · Permit 23 208426 BLD
- Cancelled
Partial permit · Partial permit - structural framing
Part Permit - Proposed construction of new 1-storey industrial building (9503m2)
Applied May 25, 2023 · completed Aug 21, 2023 · Permit 22 241433 STR
Show 11 more permits
- Cancelled
Partial permit · Partial permit - foundation
Part Permit - Proposed construction of new 1-storey industrial building (9503m2)
Applied Mar 23, 2023 · completed Jul 10, 2023 · Permit 22 241433 FND
- Closed
Drains and site services
Drain - Proposed construction of new 1-storey industrial building (9503m2)
Applied Dec 21, 2022 · issued Apr 4, 2023 · completed Jan 16, 2025 · Permit 22 241433 DRN
- Inspections under way
New building
Proposed construction of new 1-storey industrial building (9503m2)
Applied Dec 21, 2022 · issued Aug 21, 2023 · Permit 22 241433 BLD
- Closed
Drains and site services · Site service
Drain - Proposed construction of new 1-storey industrial building (9503m2)
Applied Dec 21, 2022 · issued Dec 5, 2023 · completed Jan 10, 2025 · Permit 22 241433 STS
- Closed
Heating and ventilation
HVAC - Proposed construction of new 1-storey industrial building (9503m2)
Applied Dec 21, 2022 · issued Aug 18, 2023 · completed Jan 10, 2025 · Permit 22 241433 HVA
- Closed
Plumbing
Plumbing - Proposed construction of new 1-storey industrial building (9503m2)
Applied Dec 21, 2022 · issued Aug 18, 2023 · completed Jan 16, 2025 · Permit 22 241433 PLB
- Cancelled
Plumbing
Plumbing - constuct one storey industrial building on vacant land
Applied Sep 23, 2022 · completed Oct 18, 2022 · Permit 22 207795 PLB
- Cancelled
Heating and ventilation
HVAC - constuct one storey industrial building on vacant land
Applied Sep 23, 2022 · completed Oct 18, 2022 · Permit 22 207795 HVA
- Cancelled
New building
constuct one storey industrial building on vacant land
Applied Sep 23, 2022 · completed Oct 18, 2022 · Permit 22 207795 BLD
- Cancelled
Drains and site services · Inside and outside drains
Drain - constuct one storey industrial building on vacant land
Applied Sep 23, 2022 · completed Oct 18, 2022 · Permit 22 207795 STS
- Permit issued
Drains and site services · Site service
Proposed temporary gravel parking area. No water or sanitary services are required. Only storm connection to the drain, site proposed to the existing manhole connections at property line.
Applied Apr 15, 2019 · issued Jul 8, 2020 · Permit 19 140631 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
885 Milner Ave · Consent
Proposal to sever one lot into two
140 m away · filed Sep 30, 2015 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.