Toronto address · Ward 14, Toronto-Danforth
9 Bonnie Brae Blvd
The City of Toronto has 5 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposal to do bench footings and finish basement
Applied May 15, 2017 · issued May 30, 2017 · Permit 17 160261 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to do bench footings and finish basement
Applied May 15, 2017 · issued May 30, 2017 · Permit 17 160261 BLD
- Closed
Drains and site services
Drain - Proposal to do bench footings and finish basement, back water valve and sump pump
Applied May 15, 2017 · issued May 30, 2017 · completed Nov 29, 2017 · Permit 17 160261 DRN
- Inspections under way
Plumbing
Plumbing - 1 storey rear addition with minor interior alterations to existing single family dwelling.
Applied May 28, 2009 · issued Jun 1, 2009 · Permit 09 142650 PLB
- Inspections under way
Small residential project · Multiple projects
1 storey rear addition with minor interior alterations to existing single family dwelling.
Applied May 28, 2009 · issued Jun 1, 2009 · Permit 09 142650 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
111 Linsmore Cres · Minor variance
250 m away · filed Aug 20, 2026 · Accepted
48 Queensdale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with rear exterior stairs. The existing rear deck will be demolished.
210 m away · filed May 25, 2026 · Approved
385 Sammon Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).
180 m away · filed Feb 27, 2026 · Approved
6 Kimbourne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (the existing rear one-storey will be demolished) with a ground floor deck and stairs. Also, to construct a new one-storey ancillary building (detached shed), in the rear yard of the property. The existing rear ancillary building (semi-detached garage) will be demolished.
210 m away · filed Sep 23, 2025 · Approved
473 Sammon Ave · Minor variance
To permit a personal service shop use (laundromat on the ground level and within the basement) within the existing two-storey mixed-use building (municipally known 473 Sammon Avenue). Also, to permit an office use (human resources firm on the ground level and within the basement) within the existing two-storey mixed-use building (municipally known 479 Sammon Avenue).
160 m away · filed May 6, 2025 · Approved
457 Mortimer Ave · Minor variance
To construct a new one-storey ancillary building (detached garage) in the rear yard. The existing two-storey detached dwelling will be maintained and unaltered.
170 m away · filed Jan 10, 2025 · Approved
168 Linsmore Cres · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with basement below, a rear basement walkout, and a rear ground floor deck. The existing one-storey rear partial addition will be demolished.
150 m away · filed Apr 4, 2024 · Approved
108 Queensdale Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a rear ground floor deck.
230 m away · filed Jul 19, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.