Toronto address · Ward 14, Toronto-Danforth
9 Langley Ave
The City of Toronto has 4 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Renovations to the kitchen, replace all existing with new. No additional plumbing added. Removal of interior brick wall and installation of new support. Removal of rear window and installation of new window. New roof over existing room at rear of house. New flooring. New exterior stair. No area added.
Applied Sep 19, 2016 · issued Sep 27, 2016 · completed Jun 9, 2017 · Permit 16 225208 BLD
- Inspections under way
Small residential project · Multiple projects
Proposed bench footing and finishing basement.
Applied Nov 17, 2010 · issued Nov 19, 2010 · Permit 10 298022 BLD
- Inspections under way
Plumbing
Plumbing - Proposed bench footing and finishing basement.
Applied Nov 17, 2010 · issued Nov 19, 2010 · Permit 10 298022 PLB
- Inspections under way
Small residential project · Multiple projects
Admin Permit to 11 Langley.
Applied Aug 14, 2009 · issued Aug 20, 2009 · Permit 09 157777 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
51 homes · Residential
150 m away · Site plan · Under review · filed Apr 24, 2024
Neighbours’ Committee of Adjustment files within 250 m
13 Langley Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a new rear one-storey addition, a new rear ground floor deck with stairs, and a new basement walkout stairs. The existing rear one-storey addition and deck will be demolished.
20 m away · filed Jul 20, 2026 · Hearing scheduled
47 Simpson Ave · Minor variance
To alter the rear existing one-storey ancillary building (detached garage) by constructing a complete second storey addition (containing one garden suite). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
220 m away · filed May 5, 2026 · Approved
18 Langley Ave · Minor variance
To legalize and to maintain the existing rear third storey dormer converted attic into habitable space with a rooftop patio, that were constructed beyond an authorized building permit.
60 m away · filed Mar 10, 2026 · Approved
11 Riverdale Ave · Minor variance
To construct a new two-storey semi-detached ancillary building with a complete cantilevered second storey, and front and rear juliette balconies. This ancillary building (abutting the laneway) will contain a one car garage on the ground level and storage and loft space (no habitable space) on the second level.
120 m away · filed Aug 12, 2025 · Refused
9 Riverdale Ave · Minor variance
To construct a new two-storey semi-detached ancillary building with a partially cantilevered second storey, and a rear juliette balcony. This ancillary building (abutting the laneway) will contain a one car garage on the ground level and storage and loft space (no habitable space) on the second level.
120 m away · filed Aug 12, 2025 · Refused
52 Riverdale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (west) two-storey addition, a rear second storey addition (above the existing rear one-storey addition), a third storey attic extension (for habitable space), and a rear basement walkout.
230 m away · filed Aug 11, 2025 · Approved
483 Broadview Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a basement.
170 m away · filed Mar 22, 2023 · Approved
28-30 Langley Ave · Minor variance
To permit a totoal of 24 units within the existing three-storey detached building (rooming house).
90 m away · filed Sep 28, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.