Toronto address · Ward 14, Toronto-Danforth
9 Playter Blvd
The City of Toronto has 8 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposed interior alterations throughout existing 3 storey dwelling and new 3rd Floor balcony- Partial basement underpinning (4.5 linear meters)
Applied Nov 16, 2022 · issued Nov 23, 2022 · Permit 22 136431 HVA
- Revision issued
Small residential project · Multiple projects
Revision 03: Basement floor: finished plan with proposed new laundry 50m2. ground floor: addition of servery sink, and extended joists at rear with extension of proposed awningRevision 02: Proposal to revise ground and second floor partitions and exterior window revisions
Applied Nov 4, 2022 · issued Nov 14, 2022 · Permit 22 136431 BLD (revision 03)
- Revision issued
Plumbing
Revision to PS permitPlumbing - Proposed interior alterations throughout existing 3 storey dwelling and new 3rd Floor balcony- Partial basement underpinning (4.5 linear meters)
Applied Nov 4, 2022 · issued Jun 10, 2024 · Permit 22 136431 PLB (revision 01)
- Revision issued
Small residential project · Multiple projects
Revision 02: Proposal to revise ground and second floor partitions and exterior window revisions
Applied Sep 20, 2022 · issued Oct 3, 2022 · Permit 22 136431 BLD (revision 02)
- Revision issued
Small residential project · Multiple projects
REV 01 - revision to the rear part of the building. Scope of revision is reframing part of an existing rear addition.
Applied Jun 18, 2022 · issued Jun 21, 2022 · Permit 22 136431 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
Proposed interior alterations throughout existing 3 storey dwelling and new 3rd Floor balcony- Partial basement underpinning (4.5 linear meters)
Applied Apr 20, 2022 · issued Apr 29, 2022 · Permit 22 136431 BLD
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations throughout existing 3 storey dwelling and new 3rd Floor balcony- Partial basement underpinning (4.5 linear meters)
Applied Apr 20, 2022 · issued Apr 29, 2022 · Permit 22 136431 PLB
- Closed
Drains and site services
Drain - Proposed interior alterations throughout existing 3 storey dwelling and new 3rd Floor balcony- Partial basement underpinning (4.5 linear meters)
Applied Apr 20, 2022 · issued Apr 29, 2022 · completed Jul 11, 2022 · Permit 22 136431 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
9 storeys · 107 homes · Mixed use
310 m away · Site plan · Under review · filed Apr 13, 2022
- Under review
6 storeys · 20 homes · Mixed use
340 m away · Site plan · Under review · filed May 5, 2023
- Approved
4 storeys · 19 homes · Residential
360 m away · Rezoning · Approved · filed Feb 5, 2021
- Under review
42 storeys · 857 homes · Residential
450 m away · Subdivision · Under review · filed Aug 31, 2021
- Approved
954-958 Broadview Avenue and 72 Chester Hill Road
26 storeys · 309 homes · Mixed use
470 m away · Rezoning · Approved · filed Sep 3, 2025
- Under review
954-958 Broadview Avenue and 72 Chester Hill Road
26 storeys · 310 homes · Mixed use
470 m away · Site plan · Under review · filed Dec 17, 2021
Neighbours’ Committee of Adjustment files within 250 m
32 Bayfield Cres · Minor variance
To alter the existing rear one-storey detached ancillary building (one-car garage) by constructing a complete second storey addition (containing one garden suite) with an east side cantilevered portion, and a north side flat roof cantilevered extension. Also, to construct an east side ground floor covered lounge (located below the cantilevered portion of the second level). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).
220 m away · filed Jul 21, 2026 · Hearing scheduled
70 Dearbourne Ave · Minor variance
To alter the existing three-storey detached dwelling by replacing the existing rear two-storey addition with a new two-storey addition with a third storey rooftop patio and two ground floor decks. Also, to construct a new one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.
210 m away · filed Apr 28, 2026 · Approved
50 Dearbourne Ave · Minor variance
To construct a new one-storey detached ancillary structure (partially enclosed carport), in the rear yard, abutting the laneway.
230 m away · filed Apr 16, 2026 · Approved
40 Chester Ave · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a new rear stone patio with side (north and south) brick walls and side (north and south) and rear (west) stairs. The existing rear ground floor wood deck with stairs will be demolished.
220 m away · filed Mar 20, 2026 · Approved
46 Playter Cres · Minor variance
To construct a new three-storey detached dwelling with a side (west) basement walkout (including a new secondary suite), a front covered porch with stairs, a rear ground floor deck with stairs, and a rear third storey balcony. Also, to convert the existing rear one-storey detached ancillary building (garage) into a garden shed. There will be a total of two dwelling units on the lot.
120 m away · filed Feb 20, 2026 · Approved
72 Dearbourne Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition.
210 m away · filed Dec 10, 2025 · Approved
4 Hurndale Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition at the northwest corner of the dwelling, with a basement addition below (the existing basement walkout will be demolished).
110 m away · filed Dec 4, 2025 · Approved
36 Chester Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a complete third-storey addition (expanding the existing vacant attic space into a full third storey), a rear ground floor deck, and enclosing a portion of the existing front porch with a new basement extension below.
220 m away · filed Aug 18, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.