Toronto address · Ward 19, Beaches-East York
90 Amsterdam Ave
The City of Toronto has 8 building permits since 2017 (8 still open) and 3 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
New house · New building
Proposal to to construct a single family residential dwelling with finished basement.
Applied Aug 1, 2024 · issued Sep 24, 2024 · 1 home added · Permit 24 191666 BLD
- Inspections under way
Drains and site services
Drain - PROPOSAL TO TO CONSTRUCT A SINGLE FAMILY RESIDENTIAL DWELLING WITH FINISHED BASEMENT.
Applied Aug 1, 2024 · issued Sep 24, 2024 · Permit 24 191666 DRN
- Inspections under way
Plumbing
Plumbing - PROPOSAL TO TO CONSTRUCT A SINGLE FAMILY RESIDENTIAL DWELLING WITH FINISHED BASEMENT.
Applied Aug 1, 2024 · issued Sep 24, 2024 · Permit 24 191789 PLB
- Inspections under way
New house · New building
Proposal to to construct a single family residential dwelling with finished basement.
Applied Aug 1, 2024 · issued Sep 24, 2024 · 1 home added · Permit 24 191789 BLD
- Inspections under way
Plumbing
Plumbing - PROPOSAL TO TO CONSTRUCT A SINGLE FAMILY RESIDENTIAL DWELLING WITH FINISHED BASEMENT.
Applied Aug 1, 2024 · issued Sep 24, 2024 · Permit 24 191666 PLB
- Inspections under way
Drains and site services
Drain - PROPOSAL TO TO CONSTRUCT A SINGLE FAMILY RESIDENTIAL DWELLING WITH FINISHED BASEMENT.
Applied Aug 1, 2024 · issued Sep 24, 2024 · Permit 24 191789 DRN
- Inspections under way
Heating and ventilation
Hvac - proposal to to construct a single family residential dwelling with finished basement.
Applied Aug 1, 2024 · issued Sep 24, 2024 · Permit 24 191789 HVA
- Inspections under way
Heating and ventilation
Hvac - proposal to to construct a single family residential dwelling with finished basement.
Applied Aug 1, 2024 · issued Sep 24, 2024 · Permit 24 191666 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new two-storey detached dwelling with an integral garage, a front porch, a rear ground floor deck, and a rear basement walkout.
Decision: Approved (hearing May 1, 2024)
Filed Aug 8, 2023 · File A0725/23TEY
- Closed
Minor variance · New R building
To construct a new two-storey detached dwelling with an integral garage, a front porch, a rear ground floor deck, and a rear basement walkout.
Decision: Approved (hearing May 1, 2024)
Filed Aug 8, 2023 · File A0726/23TEY
- Conditional consent
Consent · Sever lot
To obtain consent to sever the property into two undersized residential lots.
Decision: Approved (hearing May 1, 2024)
Filed Aug 8, 2023 · 1 new lot · File B0044/23TEY
What’s planned nearby
Development sites within 500 m
- Under review
1400-1410 Victoria Park Avenue
26 storeys · 951 homes · Residential
450 m away · Site plan · Under review · filed Nov 7, 2022
Neighbours’ Committee of Adjustment files within 250 m
90 Parma Crt · Minor variance
To construct two ancillary structures (solar carports) in the existing rear parking lot.
240 m away · filed May 8, 2024 · Approved
130 Yardley Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
170 m away · filed Mar 7, 2022 · Approved
130 Yardley Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a covered front porch, and a rear deck with a basement walkout on the conveyed lot (Part 1), as described in Consent Application B0025/22TEY.
170 m away · filed Mar 7, 2022 · Approved
130 Yardley Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a covered front porch, and a rear deck with a basement walkout on the retained lot (Part 2), as described in Consent Application B0025/22TEY.
170 m away · filed Mar 7, 2022 · Approved
120 Yardley Ave · Minor variance
To legalize and maintain the enclosed front porch. Also, to permit a one-storey ancillary structure (detached garage with storage above), a hot tub and a deck in the rear yard of the property.
170 m away · filed Nov 5, 2021 · Approved
104 Yardley Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front porch and a rear ground floor deck, on the conveyed lot described in Consent Application B0066/21TEY.
200 m away · filed Jun 10, 2021 · Approved
104 Yardley Ave · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front porch and a rear ground floor deck, on the retained lot described in Consent Application B0066/21TEY.
200 m away · filed Jun 10, 2021 · Approved
104 Yardley Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
200 m away · filed Jun 10, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.