Toronto address · Ward 13, Toronto Centre
90 Bleecker St
The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Multiple projects
permit for interior alterations and new third floor rear addition to existing SFD rowhouse.
Applied Dec 5, 2011 · issued Jan 9, 2012 · Permit 11 320807 BLD
- Closed
Plumbing
Plumbing - fixtures only- Remove existing 2 storey addition; reconstruct new 2 storey addition. - Addition(s). Cost included. Also included was one floor drain on 2nd floor
Applied Sep 11, 2003 · issued Sep 11, 2003 · completed Nov 17, 2020 · Permit 03 154548 PLB
- Closed
Small residential project · Addition(s)
Remove existing 2 storey addition; reconstruct new 2 storey addition.
Applied Jul 10, 2003 · issued Aug 21, 2003 · completed Nov 17, 2020 · Permit 03 154548 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Submitted
- Under review
39 storeys · 456 homes · Mixed use
120 m away · Condominium · Under review · filed Nov 8, 2021
- Under appeal
39 storeys · 378 homes · Residential
120 m away · Site plan · Under appeal · filed Jul 6, 2023
- Under appeal
10 storeys · 60 homes · Mixed use
390 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Under review
10 storeys · 60 homes · Mixed use
450 m away · Site plan · Under review · filed Jul 4, 2025
- Under review
107 homes · Residential
450 m away · Condominium · Under review · filed Oct 27, 2021
Neighbours’ Committee of Adjustment files within 250 m
183 Carlton St · Minor variance
To alter the existing two-and-one-half semi-detached building (houseplex), which is currently under construction (Building Permit 25 258356 BLD), by constructing a side (east) basement walkout with a flat roof canopy. Also, to maintain the existing rear second storey roof deck with stairs, and third storey roof deck. There will be two existing units and two new units for a total of four residential dwelling units on this lot (one unit occupying the basement level, two units occupying the first level, and one unit occupying the second and third levels).
240 m away · filed Apr 10, 2026 · Approved
169 Carlton St · Minor variance
To construct a one-storey ancillary structure (carport), in the rear yard, abutting the laneway (Doctor O Lane), for two parking spaces.
220 m away · filed Oct 10, 2024 · Approved
20 Aberdeen Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.
230 m away · filed Sep 4, 2024 · Approved
194 Carlton St · Minor variance
To convert the existing two-and-one-half-storey semi-detached mixed-use building into a three-unit dwelling (triplex).
200 m away · filed Jul 5, 2024 · Approved
50 Bleecker St · Minor variance
To construct a third storey addition (enclosed staircase) to provide access to the proposed rooftop deck for Unit 2.
90 m away · filed Jun 24, 2021 · Refused
159 Wellesley St E · Consent
To obtain consent for the creation of a new easement.
240 m away · filed Dec 7, 2020 · Approved with conditions
96 Bleecker St · Minor variance
To alter the existing 2½-storey townhouse by constructing a rear third storey addition with a balcony.
20 m away · filed Jan 4, 2019 · Approved
505 Ontario St · Minor variance
To alter the existing 2½-storey townhouse by constructing a rear second and third storey addition and a rear third storey deck.
170 m away · filed Jul 26, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.