Toronto address · Ward 11, University-Rosedale
90 Bloor St E
The City of Toronto has 6 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
HVAC - Proposal Interior alteration of existing office space and partial fitness centre into a spa, W HOTEL TORONTO, 8TH FLOOR
Applied Jun 4, 2026 · issued Jul 9, 2026 · Permit 26 177780 HVA
- Permit issued
Plumbing
Plumbing - Proposal Interior alteration of existing office space and partial fitness centre into a spa, W HOTEL TORONTO, 8TH FLOOR
Applied Jun 4, 2026 · issued Jul 9, 2026 · Permit 26 177780 PLB
- Permit issued
Addition or alteration · Interior alterations
Proposal Interior alteration of existing office space and partial fitness centre into a spa, W HOTEL TORONTO, 8TH FLOOR
Applied Jun 4, 2026 · issued Jul 9, 2026 · Permit 26 177780 BLD
- Permit issued
Addition or alteration · Interior alterations
Converting part of the 6th floor of an existing Hotel lobby/bar area into a ballroom space.
Applied Oct 3, 2025 · issued Dec 10, 2025 · Permit 25 234872 BLD
- Permit issued
Heating and ventilation
HVAC - Converting part of the 6th floor of an existing lobby/bar area into a ballroom space.
Applied Oct 3, 2025 · issued Dec 10, 2025 · Permit 25 234872 HVA
- Cancelled
Fire and security upgrade · Fire alarm
Fire alarm panel replacement
Applied Jul 5, 2022 · completed Aug 22, 2022 · Permit 22 172332 FSU
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
- Approved
85-97 Collier Street and 717 Church Street
300 homes · Residential
160 m away · Condominium · Approved · filed Sep 21, 2021
- Under review
11 storeys · 16 homes · Residential
200 m away · Site plan · Under review · filed Jul 5, 2024
- Approved
2 Bloor Street West and 820 Yonge Street
75 storeys · 725 homes · Mixed use
210 m away · Site plan · Approved · filed Dec 14, 2021
- Under review
5-17 Hayden Street, 699-707 Yonge Street and 8 Charles Street East
64 storeys · 514 homes · Mixed use
210 m away · Site plan · Under review · filed Sep 20, 2022
- Under review
826-834 Yonge Street and 8 Cumberland Street
51 storeys · 399 homes · Mixed use
220 m away · Site plan · Under review · filed Jul 22, 2026
Neighbours’ Committee of Adjustment files within 250 m
820 Church St · Minor variance
To alter the development standards for a 38-storey hotel building (as approved under Site Specific Zoning By-law 300-2023) by increasing the non-residential gross floor area, building height, and mechanical penthouse height. The new 42-storey hotel building will have a total of 192 hotel rooms.
150 m away · filed Jul 9, 2024 · Approved
30 Charles St E · Minor variance
To alter the existing three-storey residential apartment building by constructing one additional residential dwelling unit in the basement. There will be a total of 22 residential dwelling units on this lot.
190 m away · filed Jun 2, 2024 · Refused
62 Charles St E · Minor variance
To convert an existing three-storey non-residential building (originally constructed as two semi-detached dwellings), into a fourplex residential building with rear third storey rooftop terraces. This building has a Heritage designation.
210 m away · filed Jan 12, 2024 · Approved
66 Charles St E · Minor variance
To convert the existing two-and-one-half-storey detached residential (heritage) building into an apartment building by maintaining only the front portion of the existing building and constructing a 9-storey rear addition (and one mechanical penthouse level). Also, to construct a front ground floor porch and stairs, a front basement walkout, rear balconies on the second to fourth storeys, a front deck on the fourth storey, as well as front and rear balconies on the fifth to nineth storeys. There will be a total of 16 dwelling units within this apartment building.
210 m away · filed Sep 6, 2023 · Approved
55 Charles St E · Consent
To obtain consent to sever a lot (with a 50-storey residential building currently under construction) into 4 lots to separate the 100 freehold rental replacement units (located on levels 3 to 7), for ownership purposes. Also, to create easements/rights-of-way above and below-grade. There are no associated minor variance applications.
250 m away · filed Aug 31, 2023 · Approved
820 Yonge St · Minor variance
To alter the redevelopment standards for Parcel A (51-storey and 65-storey buildings (Towers A and B on the west block) and 75-storey building (Tower C on the east block)), approved under Site-Specific By-laws 661-2020 and 662-2020. The podium level office spaces (within Towers A and B) will now be for residential uses. Also, to increase the residential gross floor area and the combined residential/non-residential gross floor area.
200 m away · filed Jul 13, 2023 · Approved
830 Church St · Minor variance
To construct a four-storey service building to support TTC Bloor-Yonge Station and the tunnel infrastructure.
160 m away · filed Mar 1, 2023 · Approved
820 Yonge St · Consent
To obtain consent to sever the leasehold interest into two leasehold interests.
200 m away · filed Nov 16, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.