Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

90 Edwin Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Installation of back water valve

    Applied Nov 3, 2023 · issued Nov 27, 2023 · completed Dec 6, 2023 · Permit 23 221985 DRN

    Closed
  • Small residential project · Other

    Proposal to enlarge an existing opening for the installation of a new window.

    Applied Nov 18, 2019 · issued Nov 28, 2019 · completed Feb 6, 2020 · Permit 19 250339 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 2611 Dundas St W · Minor variance

    To alter the existing one-storey detached building (Place of Worship) by converting this building into a three-storey apartment building with complete second and third storey additions, front (east) and side (north) basement level covered entrances, front (east) and rear (west) first level decks with stairs, and rear (west) third level terraces. Also, to construct a new one-storey ancillary building (containing five bicycle spaces and garbage collection) in the rear yard of the property. There will be a total of six residential dwelling units on this lot (two units occupying the basement leve…

    170 m away · filed Dec 2, 2025 · Approved

  • 96 Edwin Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front second storey dormer, and a rear one-storey addition, a second storey addition with a deck, and a ground level deck.

    10 m away · filed Mar 10, 2025 · Approved

  • 2591 Dundas St W · Minor variance

    To construct a new three-storey medical office building.

    150 m away · filed Feb 7, 2025 · Application withdrawn

  • 38 Hugo Ave · Minor variance

    To construct a second storey on the existing rear ancillary building (detached garage) and convert it into a two-storey laneway suite. The existing parking spaces within the ground floor of the garage will be removed. The existing two-storey detached main dwelling on the lot will remain unaltered.

    250 m away · filed Nov 15, 2023 · Withdrawn

  • 2639 Dundas St W · Minor variance

    To alter the Site Specific Zoning By-laws 512-2019 and 513-2019 for the residential building under construction by increasing the total gross floor area and the height of rooftop mechanical equipment. This application is associated with Site Plan Application #18 165464 STE 14 SA that is currently under review.

    240 m away · filed Mar 30, 2023 · Approved

  • 55 Osler St · Minor variance

    To permit a rear two-storey addition.

    240 m away · filed Feb 14, 2023 · Approved

  • 1650 Dupont St · Minor variance

    To construct a new six-storey mixed-use building containing 28 residential units and 2 ground floor commercial units (retail). The existing sporting club will be demolished.

    120 m away · filed Jan 20, 2022 · Approved

  • 1611 Dupont St · Minor variance

    To convert the existing two-storey mixed-use building into an eating establishment on the ground and basement levels and office space on the second storey. Also, to construct a rear basement addition, a rear ground-level outdoor patio and a rear second-storey deck. The existing ground-level commercial unit and second-storey residential unit will be removed.

    100 m away · filed Nov 22, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.