Toronto address · Ward 9, Davenport
90 Lindsey Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal for BWV installation
Applied Jun 4, 2021 · issued Jun 17, 2021 · completed Jul 13, 2021 · Permit 21 165809 DRN
- Closed
Small residential project · Party wall admin permits
Proposal to obtain a party wall admin permit in relation to 88 Lindsey Ave, permit file #19 262682.
Applied Dec 18, 2019 · issued Apr 15, 2020 · completed Sep 2, 2025 · Permit 19 262718 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
390 m away · Condominium · Under review · filed Oct 12, 2021
- Under review
8 storeys · 57 homes · Mixed use
430 m away · Site plan · Under review · filed Feb 15, 2023
- Approved
6 storeys · 19 homes · Residential
490 m away · Site plan · Approved · filed Jul 10, 2025
Neighbours’ Committee of Adjustment files within 250 m
367 Brock Ave · Minor variance
210 m away · filed Jul 13, 2026 · Postponed
23 Lindsey Ave · Minor variance
To alter the two-and-one-half-storey semi-detached dwelling (fronting Lindsey Avenue) by constructing a rear one-storey addition (attached garage), abutting Gladstone Avenue. Previous Minor Variance Application File A1056/23TEY for a similar proposal was recently refused.
240 m away · filed Sep 26, 2024 · Approved
41 Muir Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a rear second storey deck above and a new rear ground floor deck. The existing rear deck with stairs will be demolished. The existing ancillary building (attached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.
70 m away · filed Jan 29, 2024 · Approved
1105 College St · Minor variance
To legalize and to maintain the rear one-storey addition with a deck that were constructed without an authorized building permit. Also, to alter the existing two-and-one-half-storey semi-detached mixed-use building by constructing a new rear second storey balcony, and a new canopy for the existing rear basement walkout.
200 m away · filed Jan 11, 2024 · Approved
23 Lindsey Ave · Minor variance
To alter the two-and-one-half-storey semi-detached dwelling (fronting Lindsey Avenue) by constructing a rear one-storey addition (attached garage), abutting Gladstone Avenue.
240 m away · filed Dec 13, 2023 · Refused
744 Dufferin St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing and extending the rear second storey addition, and to construct a two-storey front addition, a ground floor front verandah and stairs, as well as a new front basement patio and walkout. Also, the basement will be converted into a secondary suite, and the existing garage, in the rear yard, will be demolished (and replaced with a parking pad).
110 m away · filed Oct 19, 2023 · Approved
757 Dufferin St · Minor variance
To alter the existing one-storey semi-detached ancillary building (garage) by constructing a partial ground floor front addition and a second storey addition. The existing parking space will be removed, and this building will contain one garden suite.
120 m away · filed Oct 4, 2023 · Approved
755 Dufferin St · Minor variance
To alter the existing one-storey semi-detached ancillary building (garage) by constructing a partial ground floor front addition and a second storey addition. The existing parking space will be removed, and this building will contain one garden suite.
130 m away · filed Oct 4, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.