Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

90 Manor Rd E

The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposal for a new two storey front addition with interior alterations to the ground and second floors of an existing two storey single family dwelling. Scope includes new front porch

    Applied Mar 5, 2021 · issued Mar 18, 2021 · completed Mar 15, 2022 · Permit 21 123571 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for a new two storey front addition with interior alterations to the ground and second floors of an existing two storey single family dwelling. Scope includes new front porch

    Applied Mar 5, 2021 · issued Mar 18, 2021 · completed Mar 15, 2022 · Permit 21 123571 PLB

    Closed
  • Small residential project · Multiple projects

    Proposal for a new two storey front addition with interior alterations to the ground and second floors of an existing two storey single family dwelling. Scope includes new front porch

    Applied Mar 5, 2021 · issued Mar 18, 2021 · completed Jun 6, 2022 · Permit 21 123571 BLD

    Closed
  • Plumbing

    Plumbing - Basement underpinning and basement renovations

    Applied Mar 27, 2017 · issued Apr 7, 2017 · completed Jul 24, 2017 · Permit 17 134538 PLB

    Closed
  • Small residential project · Multiple projects

    Basement underpinning and basement renovations

    Applied Mar 27, 2017 · issued Apr 7, 2017 · completed Nov 2, 2020 · Permit 17 134538 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the two-storey detached house by reconstructing the front main wall on the ground floor and constructing a front second storey addition.

    Decision: Approved (hearing Feb 4, 2021)

    Filed Aug 21, 2020 · File A0737/20TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 16 Servington Cres · Minor variance

    To alter the existing three- storey detached dwelling (basement level is considered the first storey) by constructing a complete fourth storey addition, a rear two- storey addition (cantilevered at the southwest corner, including a basement addition below), a rear first floor covered (pergola) deck with stairs and a lift, and a rear patio and basement walkout. Also, to convert the existing rear one-storey ancillary building (detached garage) into a storage area with a ground floor deck, a covered (pergola) side (north) entrance, and a complete second storey addition containing one garden suit…

    100 m away · filed Jun 26, 2026 · Approved

  • 36 Wilfrid Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front (north) two-storey addition with a porch and stairs, a side (west) rotunda staircase, a side (east) second storey balcony, and a rear (south) two-storey addition above the integral garage extension (located within the basement level), abutting Wilfrid Avenue.

    140 m away · filed Jun 16, 2026 · Approved

  • 26 Carey Rd · Minor variance

    To construct a new undersized front yard parking pad, abutting Carey Road. The existing three-storey detached dwelling on the lot will be maintained and unaltered.

    180 m away · filed Dec 4, 2025 · Refused

  • 78 Hillsdale Ave E · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front porch, a rear basement walkout, and a rear second level deck.

    180 m away · filed Apr 16, 2025 · Approved

  • 11 Oswald Cres · Minor variance

    To construct a new two-storey detached dwelling with a front covered integral garage, a covered front porch with stairs, and a rear basement walkout. There will be a total of two residential dwelling units on this lot (one unit within the basement level and one unit to occupy the first and second levels).

    140 m away · filed Sep 30, 2024 · Refused

  • 11 Oswald Cres · Minor variance

    To construct a new two-storey detached dwelling with a front integral garage, a covered front porch with stairs, and a rear basement walkout. The existing rear one-storey ancillary building (detached garage) will be demolished. There will be a total of two residential dwelling units on this lot (one unit within the basement level and one unit to occupy the first and second levels).

    140 m away · filed Sep 30, 2024 · Refused

  • 11 Oswald Cres · Consent

    To obtain consent to sever the lot into two undersized residential lots.

    140 m away · filed Sep 30, 2024 · Refused

  • 55 Redpath Ave · Minor variance

    To alter the existing one-storey ancillary building (two-car detached garage), in the rear yard, by constructing a one-storey addition (to contain one garden suite) on the north side of the building. The existing two parking spaces within the remaining southern portion of the ancillary building will be maintained. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the garden suite).

    240 m away · filed Jun 27, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.