Toronto address · Ward 14, Toronto-Danforth
901A Pape Ave
The City of Toronto has 4 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Interior alterations
Interior alterations to create a child care on ground floor
Applied Sep 23, 2022 · issued Nov 28, 2022 · completed Mar 3, 2023 · Permit 22 207626 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations to create a child care
Applied Sep 23, 2022 · issued Nov 28, 2022 · completed Mar 3, 2023 · Permit 22 207626 HVA
- Closed
Plumbing
Plumbing - Interior alterations to create a child care
Applied Sep 23, 2022 · issued Nov 28, 2022 · completed Feb 17, 2023 · Permit 22 207626 PLB
- Closed
Plumbing · Backflow prevention devices (Water only)
Replacement one 3/4" DCVA Backflow Preventor
Applied Sep 18, 2021 · issued Oct 25, 2021 · completed Nov 1, 2021 · Permit 21 214625 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
28 East York Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).
120 m away · filed Sep 2, 2026 · Hearing scheduled
224 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by enclosing a portion of the front porch (for habitable space), a front third floor dormer expansion, a rear basement window well, a rear cantilevered second floor addition, and a rear third floor dormer addition with a rooftop deck (above the existing rear addition). The existing rear one-storey addition will be demolished.
190 m away · filed Mar 12, 2026 · Approved
45 Kings Park Blvd · Minor variance
To alter the existing two-storey detached dwelling by constructing a front second storey addition (above the existing covered front porch).
190 m away · filed Oct 3, 2025 · Approved
193 Mortimer Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space.
210 m away · filed Feb 19, 2025 · Approved
234 Browning Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (solarium). Also, to construct a one-storey ancillary building (detached garage), in the front yard.
160 m away · filed Jul 24, 2024 · Approved
46 Sammon Ave · Minor variance
To alter the existing one-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front porch), a rear two-storey addition, and a rear ground floor covered deck with stairs. The existing rear ground floor landing and stairs will be demolished.
140 m away · filed May 2, 2024 · Approved
54 Sammon Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey cantilevered addition, a partial front one-storey addition (bay window), a rear ground floor terrace, and a basement secondary suite.
170 m away · filed Nov 20, 2023 · Approved
64 Aldwych Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition (with a front balcony), and a rear ground level walkout deck. Also, to construct front basement entry stairs for the purposes of a basement secondary suite.
240 m away · filed Oct 25, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.