The City of Toronto has 9 building permits since 2017 (9 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Construction of a monument and associated works in the southwest corner of the site

    Applied Aug 12, 2026 · issued Aug 20, 2026 · Permit 26 218489 BLD

    Inspections under way
  • Addition or alteration · Addition(s)

    Revision 01: Revised locations for kitchen, dish-washing room,freight elevator. Several masonry bearing walls that were previously shown to be demolished and replaced with new stucture are now retained. New skylight, new infiltration gallery for perimeter weeping tile water.Proposal to construct steel frame addition to existing building on basement and first floor.

    Applied Aug 6, 2026 · Permit 25 114189 BLD (revision 01)

    Under review
  • Heating and ventilation

    Revision 01: Revised locations of kitchen, dish washing room, revised ductwork to exhaust kitchen. HVAC - Proposal to construct steel frame addition to existing building on basement and first floor.

    Applied Aug 6, 2026 · issued Sep 4, 2026 · Permit 25 114189 HVA (revision 01)

    Revision issued
  • Plumbing

    Revision 01: BA. Revised locations for kitchen,dish washing room. Revised ductwork for exhauset kitchen. Perimeter weeper tiles now discharged entirely onto on-site infiltration gallery. Plumbing - Proposa to construct steel frame addition to existing building on basement and first floor.

    Applied Aug 6, 2026 · issued Sep 4, 2026 · Permit 25 114189 PLB (revision 01)

    Revision issued
  • Addition or alteration · Addition(s)

    Proposal to construct steel frame addition to existing building on basement and first floor.

    Applied Feb 7, 2025 · issued May 21, 2025 · Permit 25 114189 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Proposa to construct steel frame addition to existing building on basement and first floor.

    Applied Feb 7, 2025 · issued May 21, 2025 · Permit 25 114189 HVA

    Permit issued
  • Plumbing

    Plumbing - Proposa to construct steel frame addition to existing building on basement and first floor.

    Applied Feb 7, 2025 · issued May 21, 2025 · Permit 25 114189 PLB

    Permit issued
  • Addition or alteration · Interior alterations

    interior alterations on 1st floor (new ceiling/lighting/diffusers/sprinklers)

    Applied Oct 3, 2005 · issued Oct 27, 2005 · Permit 05 189374 BLD

    Inspections under way
  • Addition or alteration · Addition(s)

    Addition to existing temple

    Applied Jul 2, 2004 · issued Jan 6, 2005 · Permit 04 152693 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To permit proposed expansions to the existing building that will result in an increase of the gross floor area from approximately 3,996 square metres to approximately 4,803.5 square metres (an increase of approximately 806.7 square metres of gross floor area). The proposed additions are located at the four (4) corners of the existing building for uses that include but are not limited to: prayer rooms and halls, meeting and storage rooms, a relocated kitchen area and classrooms. NOTE: The proposed development will not introduce any new uses. The proposal is to increase or expand on and/or relo…

    Decision: Approved (hearing Mar 31, 2021)

    Filed May 4, 2020 · File A0098/20SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 296 Passmore Ave · Minor variance

    To convert the existing integral garage into an office space and to permit the use of an office space and storage for an electrical contracting/gas fitting business.

    140 m away · filed Sep 9, 2024 · Approved

  • 292 Passmore Ave · Consent

    To obtain consent to the technical severance of 292 Passmore Avenue and 296 Passmore Avenue for the purpose of re-establishing two separate lots. The lots were merged on title in 2007. The owner is now requesting consent to sever the land into two lots in the same configuration as they originally were before merging. The owner is also conveying two parts to the City to satisfy the right-of-way requirements along the site frontage of Passmore Avenue.

    120 m away · filed Nov 25, 2021 · Approved

  • 260 Ingleton Blvd · Minor variance

    To redevelop the existing place of worship with a new two-storey building. This application was deferred at the March 31, 2021 virtual hearing to allow the applicant an opportunity to discuss matters raised by the property owner of 3450 McNicoll Avenue with the property owner and Community Planning staff.

    180 m away · filed Dec 24, 2020 · Approved

  • 875 Middlefield Rd · Minor variance

    To construct a new one-storey 3,079 m2 addition to join the existing industrial buildings at 875 Middlefield Road and 335 Passmore Avenue. The two properties have been merged as one lot. This application was deferred at the June 16, 2020 hearing in order for the applicant to obtain a parking study.

    210 m away · filed Feb 26, 2020 · Approved

  • 900 Middlefield Rd · Minor variance

    To permit a proposed garbage storage enclosure at the rear of the multi-tenanted commercial property.

    120 m away · filed Jun 1, 2018 · Application withdrawn

Everything planned in Scarborough North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.