The City of Toronto has 9 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REV01: changes as per cover letter

    Applied May 21, 2019 · issued Jun 4, 2019 · completed Dec 23, 2019 · Permit 18 220743 BLD (revision 01)

    Closed
  • Small residential project · Multiple projects

    Proposed second dwelling unit in basement.

    Applied May 15, 2019 · issued Jun 19, 2019 · completed Aug 24, 2026 · 1 home added · Permit 19 154545 BLD

    Closed
  • Plumbing

    Plumbing - Rear extension of walkout basement and main floor (48.4m2) of a single storey detached dwelling, including complete removal of existing roof

    Applied May 9, 2019 · issued May 9, 2019 · Permit 18 220743 PLB

    Inspections under way
  • Drains and site services

    Proposed back water valve.Drain - Rear extension of walkout basement and main floor (48.4m2) of a single storey detached dwelling, including complete removal of existing roof

    Applied May 9, 2019 · issued May 9, 2019 · completed May 24, 2019 · Permit 18 220743 DRN

    Closed
  • Heating and ventilation

    HVAC - Rear extension of walkout basement and main floor (48.4m2) of a single storey detached dwelling, including complete removal of existing roof

    Applied Sep 6, 2018 · issued Apr 26, 2019 · Permit 18 220743 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Rear extension of walkout basement and main floor (48.4m2) of a single storey detached dwelling, including complete removal of existing roof

    Applied Sep 5, 2018 · issued Apr 26, 2019 · completed Dec 23, 2019 · Permit 18 220743 BLD

    Closed
  • Heating and ventilation

    HVAC - Fire damage repair to single family dwelling. Restoration/replacement of existing HVAC system.

    Applied May 30, 2018 · issued Jun 7, 2018 · completed Oct 20, 2025 · Permit 18 158302 HVA

    Cancelled
  • Small residential project · Fire damage

    Fire damage repair to single family dwelling

    Applied May 14, 2018 · issued May 23, 2018 · completed Oct 20, 2025 · Permit 18 158302 BLD

    Cancelled
  • Plumbing

    Plumbing - Fire damage repair to single family dwelling

    Applied May 14, 2018 · issued May 23, 2018 · completed Oct 20, 2025 · Permit 18 158302 PLB

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Scarborough-Guildwood

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.