Toronto address · Ward 12, Toronto-St. Paul's
91 Winnett Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install back water valve
Applied Apr 17, 2018 · issued Apr 17, 2018 · completed Apr 20, 2018 · Permit 18 144704 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
519 Rushton Rd · Minor variance
To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, front and rear ground floor porches with stairs, side (north) yard entrances on the ground floor, and front and rear second and third storey balconies. The second storey will be cantilevered at the north side of the building. Also, to construct a new rear two-storey detached ancillary building (garden suite) containing one residential dwelling unit. There will be a total of seven residential dwelling units on this lot (two units within the basement, two units on the ground floor, and two units…
170 m away · filed Aug 7, 2026 · Hearing scheduled
485 Rushton Rd · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial rear second storey addition (which will be cantilevered above the existing one-storey addition).
200 m away · filed Jul 13, 2026 · Approved
162 Winnett Ave · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a front porch with stairs, a rear ground floor deck with stairs, a rear basement walkout with a terrace, and a rear third storey balcony (above the second floor), There will be a total of two residential dwelling units on this lot (one unit occupying a portion of the basement and all three storeys, and an additional unit occupying the remaining portion of the basement).
240 m away · filed Apr 8, 2026 · Approved
315 Arlington Ave · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a partially covered front porch with stairs, a rear second storey deck with stairs, and a rear basement walkout with a patio. The third storey will be partially cantilevered at the front and rear of the dwelling.
130 m away · filed Jun 17, 2025 · Approved
36 Valewood Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a rear third storey balcony, a rear two-storey addition, a partial front one-storey addition, a front covered porch, and a rear ground floor deck.
190 m away · filed Apr 11, 2025 · Approved
178 Atlas Ave · Minor variance
To alter the existing rear one-storey ancillary building (detached garage) by constructing a complete second storey addition (which will be cantilevered to the north side), for one garden suite to occupy both levels. There will be two bicycle parking spaces on the north side wall. There will be a total of three residential dwelling units on this lot (two units within the main dwelling and one unit within the ancillary building).
140 m away · filed Feb 10, 2025 · Approved
68 Winnett Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor deck and stairs. Also, to construct a one-storey ancillary building (to contain a gym) in the rear yard.
90 m away · filed Jan 24, 2025 · Approved
162 Winnett Ave · Minor variance
To legalize and to maintain the enclosed front porch of the existing one-storey detached dwelling, which was constructed without an authorized building permit.
240 m away · filed Dec 16, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.