Toronto address · Ward 12, Toronto-St. Paul's
92 Pleasant Blvd
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing · Fixtures/Roof Drains: SFD
Proposal to replace and relocate plumbing fixtures within existing SFD.
Applied Mar 6, 2017 · issued Mar 7, 2017 · Permit 17 124808 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
Not stated in the file
230 m away · Subdivision · Under review · filed Oct 19, 2021
- Under appeal
50 storeys · Residential
230 m away · Site plan · Under appeal · filed Aug 20, 2021
- Approved
- Under appeal
17 storeys · Mixed use
300 m away · Rezoning · Under appeal · filed Feb 18, 2021
- Under review
242 homes · Residential
330 m away · Condominium · Under review · filed Nov 4, 2021
- Under review
Neighbours’ Committee of Adjustment files within 250 m
29 Pleasant Blvd · Minor variance
To alter the development standards, as approved within Site Specific Zoning By-laws 166-2022 and 167-2022, which include changes to the overall height, parking standards, and density for the 40-storey residential building.
240 m away · filed Jun 27, 2023 · Refused
19 Alvin Ave · Minor variance
To convert the existing two-and-one-half-storey detached mixed-use dwelling from two units into four units by installing one additional commercial unit within the basement and constructing rear second and third storey addition over the existing one-storey rear portion of the dwelling, that will also be cantilevered over the existing parking space abutting the laneway. Also, to construct two one-storey and two-storey front additions, a rear fourth storey rooftop deck, third storey balconies on the side (north), second storey balconies in the front and rear, and a rear basement walkout. There w…
240 m away · filed May 16, 2023 · Refused
78 Inglewood Dr · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a ground floor deck, a second storey balcony, and a side (south) integral garage. Also, to reconstruct a driveway in the side (south) yard, abutting St. Clair Avenue East.
240 m away · filed Dec 22, 2022 · Approved
21 St Clair Ave E · Minor variance
To permit a fitness studio with a medical (chiropractor) office and retail use within the second storey of the existing 14-storey commercial building.
230 m away · filed Apr 12, 2022 · Approved
16 Ferndale Ave · Minor variance
To construct a two-storey ancillary building (for the use of a laneway suite) in the rear yard of the property (abutting the lane).The second level is proposed to be cantilevered along the rear (west) lot line and will have a juliet balcony.
220 m away · filed May 9, 2021 · Refused
77 St Clair Ave E · Minor variance
To renovate and expand the existing two-storey podium containing retail, office, and school uses. The residential tower and townhouse components will not be modified.
110 m away · filed Mar 1, 2021 · Approved
20 Rose Park Cres · Minor variance
To reconstruct the garage in the rear yard of the existing 2½-detached house.
230 m away · filed Sep 9, 2020 · Approved
20 Rose Park Cres · Minor variance
To reconstruct a two-car garage attached to the rear deck of the existing 2½-storey detached dwelling.
230 m away · filed May 13, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.